SOLICITATION NOTICE
Y -- Saginaw Bay CDF Offloading Ramp Repair
- Notice Date
- 12/13/2022 7:32:10 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- W072 ENDIST DETROIT DETROIT MI 48226-5000 USA
- ZIP Code
- 48226-5000
- Solicitation Number
- W911XK22B0006
- Response Due
- 12/21/2022 10:00:00 AM
- Archive Date
- 01/18/2023
- Point of Contact
- Kari Tauriainen, Phone: 3132262797
- E-Mail Address
-
Kari.Tauriainen@usace.army.mil
(Kari.Tauriainen@usace.army.mil)
- Small Business Set-Aside
- HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- Awardee
- null
- Description
- *****Update: December 13, 2022 - Amendment 0003 has been included to extend the Bid due date and the Bid Opening date. *****Update: December 1, 2022 - Amendment 0002 has been included to provide Government responses to Requests for Information (RFIs) received since November 23, 2022, update Drawing SF-500, include a summary of RFI responses from Amendment 0001, and extend the Bid due date and the Bid Opening date. The Amendment and Attachments A and B may be found in PIEE. ***** Update: November 23, 2022 - Amendment 0001 has been included to provide Government responses to all Requests for Information (RFI) during the RFI period, to provide updated Specifications and Drawings, and to extend the Bid due date and the Bid Opening date. The Amendment and the updated documents may be found in PIEE. ***** The Saginaw Bay Confined Disposal Facility trestle and offload platform are currently in a state of failure and must be replaced with an adequate structure for future use during dredging operations. Engineers from the United States Army Corps of Engineers (USACE), Detroit District (LRE), Design Branch have designed a replacement structure to be constructed in the same location as the existing structure. The contractor for the project will be required to mobilize to the site; demolish the existing structure in its entirety, including the existing driven piles to the pile tip depth; dispose of all materials and debris associated with the existing structure; produce and provide as-built drawings for new structure; drive piles for new structure with a level of accuracy that allows the designed bolted connections to be properly aligned and connected, without any need for field alterations to address pile misalignment; construct new structure safely and efficiently to result in a structure which performs as intended by design engineers; demobilize from site. All work must be conducted ethically, honestly, and in the allotted timeframe. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911XK22B0006' to obtain more details.*
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e35206ea903847feb71ff75523648da8/view)
- Record
- SN06542333-F 20221215/221214015836 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |