Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 23, 2022 SAM #7696
SOURCES SOUGHT

P -- Battle Creek Wind Turbine Demolition

Notice Date
12/21/2022 1:57:54 PM
 
Notice Type
Sources Sought
 
NAICS
562910 — Remediation Services
 
Contracting Office
US ARMY ENGINEER DISTRICT CHARLESTO CHARLESTON SC 29403-5107 USA
 
ZIP Code
29403-5107
 
Solicitation Number
W912HP-23-S-3008
 
Response Due
1/6/2023 11:00:00 AM
 
Point of Contact
Lakesha Sheard
 
E-Mail Address
Lakesha.S.Sheard@usace.army.mil
(Lakesha.S.Sheard@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
�The purpose of this project is to demolish the Wind Turbine located in the tactical vehicle parking lot at MCRC Battle Creek, MI. The secure perimeter of the tactical vehicle lot shall be maintained throughout the project. �Provide complete demolition, site restoration and stabilization. �This scope of work is a performance-based requirement. �The Contractor shall provide sufficient technical support and project management to assure quality and completeness of all submittals and physical work.� Note: (1) If the decision is to Set-Aside this procurement for HUBZone Small Business, the contractor shall be required to perform in accordance to 13 Code of Federal Regulation (CFR) SUBPART 126.700. (a) A qualified HUBZone Small Business receiving a HUBZONE contract for general construction must perform at least 15% of the contract either itself or through subcontracts with other qualified HUBZONE Small Business concerns. Note: (2) If the decision is to Set-Aside this procurement for Service Disabled Veteran-Owned Small Business, the contractor shall be required to perform in accordance to Federal Acquisition Regulation (FAR) 52.219-14 Limitation on Subcontracting (b) states, �The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.� � The Contractor shall be capable of providing Performance and Payment Bonds within five (5) calendar days after award. The contractor shall begin work within five (5) calendar days after acknowledgement of the Notice to Proceed. Completion time for this project will be specified in the solicitation. If the contractor fails to complete the work within the specified number of days, the contractor shall pay liquidated damages to the Government in the amount specified in the contract. If you can meet all of the requirements for this project and the information in the questionnaire, please respond to this sources sought synopsis by email to Lakesha Sheard, Lakesha.S.Sheard@usace.army.mil.� Email is the preferred method when receiving responses to this synopsis.� Response must be received no later than 2:00 P.M. Eastern Standard Time, on 06 January 2023.� For the exact deadline, see the response date on the announcement page.� Late responses may be considered, however interested parties are advised that an acquisition strategy decision will be approved ASAP after the deadline, and as such the Government reserves the right to disregard late responses. Please submit the following information and the information required in the attached worksheets:�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0e0f3d76c2f04fbb9614c04927ee94c6/view)
 
Place of Performance
Address: Battle Creek, MI, USA
Country: USA
 
Record
SN06549885-F 20221223/221221230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.