SOLICITATION NOTICE
W -- Lease/Own Main Office & Guest Trailers
- Notice Date
- 1/9/2023 8:57:53 AM
- Notice Type
- Solicitation
- NAICS
- 531120
— Lessors of Nonresidential Buildings (except Miniwarehouses)
- Contracting Office
- ARGONNE NATL LAB - DOE CONTRACTOR Lemont IL 60439 USA
- ZIP Code
- 60439
- Solicitation Number
- 3-B175-P-00048-00
- Response Due
- 1/13/2023 2:00:00 PM
- Archive Date
- 01/13/2023
- Point of Contact
- Jenna Doria-Garner, Phone: 630-252-6988
- E-Mail Address
-
jdoria@anl.gov
(jdoria@anl.gov)
- Description
- Proposals to be provided no later than 01/13/2023.� Expectations of delivery of trailers to be July 2023. The United States Department of Energy, Atmospheric Radiation Measurement (ARM) User Facility, 3rd Mobile Facility will be deployed in the Bankhead National Forest in Alabama. The project requires a mobile office trailer that will house the facility staff and equipment and a Guest Instrument trailer to be used for research projects.� �Please provide quotes to purchase or lease the Main Office and Guest Trailers.�� Main Office Trailer Specifications:�������������� Contractor is responsible to ensure code compliance in all building systems and designs. The designs and content contained in this document are intended to convey general requirements. Exact compliance with trade excellence standards and final code compliance is the responsibility of the bidder and any according subcontractors. Designed elements should be submitted for review prior to fabrication and a final set of drawings will be provided to the end user. Quote to be submitted as a purchase option and a lease option. Project is temporary with a scheduled term of 6-8 years. The lease option to include removal of all trailer and associated construction materials once the term has expired and the facility is closed. Lease option to include maintenance agreement for trailer and HVAC equipment. Main Office trailer is based on a 36� x 60� module, reference attached drawing KS001. Dimensions shown are for reference; exact locations can be altered per manufacturer�s recommendation to aid in the standard construction of the main office trailer. Alterations will need to be approved by the ANL Technical Representative. Main Office trailer to be fully skirted. Main Office trailer to include platform and steps at each entrance door. Main entrance steps to be ADA compliant. Main Office interior to be ADA compliant where applicable. HVAC system throughout Main Office trailer (see computer room exception). Computer Room AC: 2 Ton unit separate from the main facility with redundancy. �LED lighting throughout facility. �Floor coverings to be commercial grade carpet. �Electrical Requirements: �Typical 120-volt duplex electrical outlets in all rooms except repair room and computer room. Computer Room: Four 120-volt 20-amp duplex outlets, two 120-volt 30-amp plugs centered in the room dropped from the ceiling with 4-foot reach. (5LP30 twist lock) Repair Room: Ten 120-volt 20-amp duplex outlets (3 outlets max per breaker), one 220-volt 50-amp outlet. Lighting to be controlled by switch mounted occupancy sensors with manual override. Provide Exit / Emergency lighting fixtures with battery backup as required by code. �Data network: All data cables to be routed from computer room to designated point. Cables to have 12� of lead, rolled, tied, unterminated, and identified per location. Wiring to be Cat-5e Unshielded Twisted Pair, solid conductor. Two cables per drop; one black jacketed, one green jacketed. Each cable in a drop terminated to an RJ-45 jack in a single wall plate, color coded to match the cable jacket. Repair room to have 4 prewired jacks equally spaced around the room. Offices and BBS room to have 2 prewired jacks each. Reception area to have 3 prewired jacks. Break area to have 3 prewired jacks, one floor mounted in the center of the conference table, and one black cable in the ceiling in the center of the room (wifi access point). Interior Furnishings: Reception Area: Welcome desk with seating and two additional guest seats. Break Room: Two tables with seating for eight. Conference Area: One conference table with seating for eight. Office Space (5): �L� shaped desk with side drawer file cabinet, desk seating and one guest chair. Guest Instrument Trailer Specifications: �������������� Contractor is responsible to ensure code compliance in all building systems and designs. The designs and content contained in this document are intended to convey general requirements. Exact compliance with trade excellence standards and final code compliance is the responsibility of the bidder and any according subcontractors. Designed elements should be submitted for review prior to fabrication and a final set of drawings will be provided to the end user. Quote to be submitted as a purchase option and a lease option. Project is temporary with a scheduled term of 6-8 years. The lease option to include removal of the Guest Instrument trailer and associated construction materials once the term has expired and the facility is closed. Lease option to include maintenance agreement for Guest Instrument trailer and HVAC equipment. Guest Instrument trailer size has not been finalized and two different sizes are to be quoted. One based on a 1340-1400 sq-ft floor plan the other 1000-1100 sq-ft floor plan. The floor plan for the Guest Instrument trailer is represented in the attached drawing KS002. Dimensions shown are for reference, exact dimensions can be altered per manufacturer�s recommendation to aid in the standard construction of the Guest Instrument trailer. Floor plan is an open area with no rooms. Alterations will need to be approved by the ANL Technical Representative. Guest Instrument trailer to contain four custom skylights with removable covers as shown in attached drawing, location to be determined once final floor plan is determined. Three openings are to be 24�x24�, and the fourth will be a 21�x43�. Guest Instrument trailer to have ten 4� wall penetrations as shown in the attached drawing. Five are at 28� height above finished floor and five at 72� above finished floor level. Guest Instrument trailer to be fully skirted. Guest Instrument trailer to include platform and steps at each entrance door. Main entrance steps to be ADA compliant. Guest Instrument trailer interior to be ADA compliant where applicable. HVAC to be designed at 2X rated capacity to account for thermal loading of test instrumentation. LED lighting throughout facility. Air curtain at each door entrance. Floor coverings to be commercial grade vinyl or equivalent. �Electrical Requirements: Two 200-amp service panels. One 100-amp service panel fed with a 100-amp UPS unit. UPS to be supplied by customer. Thirty�120-volt 20-amp duplex outlets. Outlets to be spaced approximately 5' apart around perimeter of facility. Three outlets max per breaker. Every other outlet (orange color) to be serviced by the UPS unit with two outlets max per breaker. Two 220-volt 50-amp outlets. Lighting to be controlled by switch mounted occupancy sensors with manual override. Provide Exit / Emergency lighting fixtures with battery backup as required by code. �Data network wiring: All data cables to be routed from a corner location of the Guest Instrument trailer. Cables to have 12� of lead, rolled, tied, unterminated, and identified per location. Wiring to be Cat-5e Unshielded Twisted Pair, solid conductor. A total of (25) jacks, two cables per drop; one black jacketed, one green jacketed. Each cable in a drop terminated to an RJ-45 jack in a single wall plate, color coded to match the cable jacket. One black cable in the ceiling centered in the room (wifi access point).
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/bd24d44f5a2248c5a44fe688a4dee774/view)
- Place of Performance
- Address: Moulton, AL 35650, USA
- Zip Code: 35650
- Country: USA
- Zip Code: 35650
- Record
- SN06559314-F 20230111/230109230103 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |