Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 15, 2023 SAM #7719
SOLICITATION NOTICE

Z -- GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest

Notice Date
1/13/2023 6:45:40 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, CSA INTERMOUNTAIN 8 Ogden UT 844012310 USA
 
ZIP Code
844012310
 
Solicitation Number
1240LT23R0002
 
Response Due
2/28/2023 3:30:00 PM
 
Archive Date
04/30/2023
 
Point of Contact
Tanya Spanfellner, Phone: 2082581041
 
E-Mail Address
tanya.spanfellner@usda.gov
(tanya.spanfellner@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Solicitation Posting Presolicitation Notice GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest DESCRIPTION OF WORK Project Description: Furnish all labor, equipment and materials necessary to accomplish the work under this contract.� This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex.� Work will occur at three primary locations as follows: Entrance Area ~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail. Roundabout Area ~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation. Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage. North Shore Area ~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 28-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway. ~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services. Reconstruct the North Shore Day Use Area including site amenities. Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state. Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required. Project Location: From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214.� This represents the point of beginning of the Entrance Area.� From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area.� From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area.� From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area. Contract Time: The work anticipated under any contract resulting from this solicitation anticipated start date for administrative and construction preparation tasks- June 5, 2023 August 14, 2023 � anticipated start date for on-the-ground construction. The Project End Date will be October 31, 2024 The magnitude of proposed project is between $1,000,000 and $5,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/794f29388d5049c0abc07d8aeed7f0e9/view)
 
Place of Performance
Address: Stanley, ID, USA
Country: USA
 
Record
SN06564110-F 20230115/230113230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.