SOLICITATION NOTICE
Z -- Crest Raise at MSH SRS
- Notice Date
- 1/25/2023 10:03:53 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
- ZIP Code
- 97204-3495
- Solicitation Number
- W9127N22R0021
- Response Due
- 10/5/2022 2:00:00 PM
- Archive Date
- 02/01/2023
- Point of Contact
- Harron Elloso, Phone: 5038084618, Clinton Jacobsen
- E-Mail Address
-
Harron.E.Elloso@usace.army.mil, clinton.m.jacobsen@usace.army.mil
(Harron.E.Elloso@usace.army.mil, clinton.m.jacobsen@usace.army.mil)
- Description
- Effective 25 Jan 2023 this solicitation is cancelled in its entirety. ------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001 - Proposal due date extended to 05 October 2022 at 1400PST. -------------------------------------------------------------------------------------------------------------------------------------- 8/26/2022 - SF 24 -� Bid Bond, is uploaded.� --------------------------------------------------------------------------------------------------------------------------------------- The Government intends to procure this requirement on a competitive basis in accordance with the provisions as set forth in FAR Part 15, Contracting by Negitiation.� SOLICITATION NUMBER: W9127N22R0021 NAICS Code: 237990 SIZE STANDARD: $39.5M SET-ASIDE: Full and Open DESCRIPTION OF REQUIREMENT The work will involve the construction of a second crest raise at the SRS. The second crest raise will raise the spillway channel by 10 feet. Along with construction of the second crest raise, a new plunge pool will have to be constructed, and a low flow channel excavated in rock. As part of the project, the contractor will be required to construct water diversion structures so that the work can be performed in the middle of a river.� BACKGROUND The SRS was constructed in the late 1980s to store the sediment coming off the avalanche area at Mount Saint Helens so that the sediment does not flow down to the low Cowlitz River. The main objective for the project is to keep the level of protection on the levee systems from Castle Rock to Lexington. A crest raise has already been completed in 2012. This will be the second of three planned crest raises.�
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/9a9e916d70f94029aa7cb615ebb5b51f/view)
- Place of Performance
- Address: Toutle, WA, USA
- Country: USA
- Country: USA
- Record
- SN06573049-F 20230127/230125230108 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |