Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 26, 2023 SAM #7761
SOLICITATION NOTICE

Y -- Kenai Lake Work Center Water/Wastewater System Improvements

Notice Date
2/24/2023 1:54:47 PM
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
USDA-FS, CSA NORTHWEST 7 Portland OR 972042829 USA
 
ZIP Code
972042829
 
Solicitation Number
1240BJ23R0004
 
Response Due
3/13/2023 4:30:00 PM
 
Point of Contact
Roxanne Anderson - Contracting Officer, Phone: 5036681730
 
E-Mail Address
roxanne.d.anderson@usda.gov
(roxanne.d.anderson@usda.gov)
 
Description
This is a 15 day Presolicitation that will close on Monday March 13, 2023 by 4:30pm pst.� The Soliciation package will be posted on or soon there after.� This project will have a Pre-Bid Site visit that contractors are strongly encouraged to attend. The exact date of the Pre-Bid visit will be within the posted solicitation. The government estimate for this project is between: $1,500,000 - $3,000,000 The estimated period of performance for this project is:� 5/1/2023 - 10/31/2024 Project Name:� Kenai Lake Work Center Water & Wastewater System Improvements Description SUMMARY A. This project is located at the Kenai Lake Work Center (KLWC). The address is Mile 24 Seward Highway, Seward AK 99664, on the West side of the highway. The KLWC is located approximately 6 miles south of Moose Pass, Alaska. B. Project Summary Description: The following descriptions are provided as an outline of major work items, and shall not be constructed as an inclusive or complete listing of all items of Work under this Contract. 1. Base Bid includes the following: a) Utility improvements which include (1) hazardous abatement of the existing crew house building; (2) Site demolition; (3) Site preparation; (4) Site Mechanical which includes utilities improvements of the existing water distribution system, installing a new sewer collection system and appurtenances, and installing a new wastewater treatment system and appurtenances; (5) and site electrical which includes the improvements to the new wastewater treatment system per the plans and specifications. 1.2 GENERAL SITE CONDITIONS AND WEATHER A. The elevation of the site is approximately 450 feet above mean sea level. The construction site experiences heavy snowfall and cold temperatures (sometimes extreme), with snow on the ground typically from October through May. Precipitation averages 64 inches per year, with average total snowfall of 75 inches per year, as provided by www.weather-us.com. 1.3 USE OF PREMISES A. General: Contractor shall have limited use of premises for construction operations, including use of Project Site, during construction period. Contractor's use of premises is limited by the Government's right to perform work at the site. The KLWC office is open year-round and several full-time staff occupy the premise. Seasonal staff arrive intermittently throughout the year occupying the residences on the jobsite. B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. C. Confine storage of materials to areas as approved by the CO. D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas. E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. F. Provide temporary barriers to protect existing trees and plants and root zones. 1. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction. 2. Do not fasten ropes, cables, or guys to existing trees. 3. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage. G. Existing Utilities: Notify CO of proposed locations and times for excavation. 1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. 2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities. 1.4 MEALS AND LODGING A. Meals and lodging are commercially available in Seward, AK, within 25 miles of the construction site. Meals will not be available at Forest Service facilities. Camping at nearby campgrounds may be allowed if approved. 1.5 CAMPING A. Camping is not allowed at the construction site. Permission may be granted to camp at a nearby location. 1.6 FIELD VERIFICATION A. Field verify all new and existing dimensions affecting the work of this contract before ordering products 1.7 REQUIREMENTS OF THE OFFERER�S PROPOSAL A. The Government Drawings and Specifications are the basis for this Contract. B. The work shall conform to the Drawings as closely as possible. Those products listed in the Specifications are preferred products, chosen for compatibility, longevity, durability and quality. However, equal or better alternatives submitted by the Offerer will be considered. 1.8 PERMITTING A. The Contractor shall be responsible for obtaining all permits and associated fees required to complete the project. B. Government-furnished permits/approvals include approval from the Alaska Department of Environmental Conservation (ADEC) for public water and wastewater installation. C. All electrical permit and inspection is to be by the local AHJ.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7271d3d1a2e24bcd8227722922fd67fc/view)
 
Place of Performance
Address: Seward, AK 99664, USA
Zip Code: 99664
Country: USA
 
Record
SN06601142-F 20230226/230224230102 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.