SPECIAL NOTICE
A -- TDD R&D Support Bridge OASIS Task Order
- Notice Date
- 3/1/2023 10:38:47 AM
- Notice Type
- Justification
- NAICS
- 54171
— Research and Development in the Physical, Engineering, and Life SciencesT
- Contracting Office
- GSA FAS AAS REGION 4 ATLANTA GA 30308 USA
- ZIP Code
- 30308
- Solicitation Number
- 47QFSA23F0018
- Archive Date
- 03/31/2023
- Point of Contact
- April Trice, Phone: 2565206716
- E-Mail Address
-
April.Trice@gsa.gov
(April.Trice@gsa.gov)
- Award Number
- 47QFSA23F0018
- Award Date
- 02/27/2023
- Description
- The General Service Administration (GSA), Federal Acquisition Service (FAS), Assisted�Acquisition Services Division (AASD) has received a requirement to provide a bridge task order�for research and development (R&D) engineering services, hardware development, and testing�for air and ground-based weapon system technologies to identify current threats, system�vulnerabilities, and develop solutions in support of the Technology Development Directorate�(TDD) of the Combat Capabilities Development Command, Aviation and Missile Center�(DEVCOM AvMC), located at Redstone Arsenal, Huntsville, Alabama. The nature of this action is to secure authority to continue support for no more than 12 months,�by awarding a Time and Materials (T&M) Task Order with a six (6) month base period and a 6-month Option to Extend Services in accordance with FAR clause 52.217-8. The current task�order expires March 5, 2023, with no additional options available to extend services. While a�follow-on effort is being procured by US Army Contracting Command � Redstone Arsenal�(ACC-Redstone), the projected award date of this follow-on effort currently falls on May 30,�2023, which is after the current task order�s expiration date. Due to the gap between this task�order�s expiration date and the follow-on effort�s projected award date, the client requested a�bridge to allow for continued performance with no break in service. Based on the client�s�understanding of the potential award timeline and taking into account anticipated milestone�slippages and the elevated post-award protest risk where a CICA Stay/Stop Work Notice could�be issued for the performance of the follow-on award, the client requested the period of�performance (PoP) for this bridge be structured as a 6-month Base Period with a 6 month�Extension of Services (EOS) option.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/f0eb7b1b09564e30871a9dcc889d09cc/view)
- Record
- SN06604895-F 20230303/230301230102 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |