Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 03, 2023 SAM #7766
SOLICITATION NOTICE

15 -- SYNOPSIS OVERHAUL OF THE RELAY ASSEMBLY

Notice Date
3/1/2023 6:54:04 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
335314 — Relay and Industrial Control Manufacturing
 
Contracting Office
W6QK ACC-RSA REDSTONE ARSENAL AL 35898-0000 USA
 
ZIP Code
35898-0000
 
Solicitation Number
W58RGZ23B0014
 
Response Due
3/11/2023 3:00:00 PM
 
Archive Date
03/26/2023
 
Point of Contact
Edward A. Peterson, Phone: 2563138529, Gerod A. Ferrell, Phone: 2568421842
 
E-Mail Address
edward.a.peterson4.civ@army.mil, gerod.a.ferrell.civ@mail.mil
(edward.a.peterson4.civ@army.mil, gerod.a.ferrell.civ@mail.mil)
 
Description
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �SYNOPSIS ACTION CODE: Pre-solicitation Notice DATE/YEAR: 1 MARCH 2023 CONTRACTING OFFICE ZIP CODE: 35898-5820 PRODUCT OR SERVICE CODE: 1560 CONTRACTING OFFICE ADDRESS: U.S. ARMY AVIATION and MISSILE COMMAND (W58RGZ),�ATTN: CCAM-ALB, BUILDING 5303, MARTIN ROAD.�REDSTONE ARSENAL, AL 35898-5280 SUBJECT: �Synopsis for Overhaul of the Relay, Assembly UH-60 SOLICITATION NUMBER: W58RGZ-23-B-0014 RESPONSE DATE: �10 DAYS FROM POSTING�� CONTRACT POINT OR CONTACTING OFFICER: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil LINE ITEM NUMBER: TBD PLACE OF PERFORMANCE:TBD The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul/upgrade of the following assets: NOMENCLATURE: UH-60, Relay, Assembly INPUT APN: 70550-02102-056 OUTPUT APN: 70550-02102-056 INPUT NSN: 5945-01-325-0624 OUTPUT NSN: 5945-01-325-0624 ESTIMATED QUANTITY: Minimum 100 each � Maximum 600 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 100 each) The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum / maximum quantities listed above. These items are noncommercial; FAR Part 12 will not be utilized. Required delivery shall be FOB Origin. This NSN is not a critical safety item. No Depot Maintenance Work Requirement DMWR has been identified for this effort. A Product Verification Audit (PVA) is required. 1. The U.S. Army Contracting Command � Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the Relay, Assembly. All work shall be completed in accordance with the Statement of Work (SOW). The Government does not have a Depot Maintenance Work Requirement (DMWR). 2. This IFB will be issued as a Full and Open Competition. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder whose bid represents the lowest priced, technically acceptable bid. This IFB will be issued using the Two-Step Sealed Bidding Method under FAR part 14. 3. When the solicitation is posted bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids. Technical proposals (Step-One) shall not include prices or pricing information. The Technical proposal due date will be established upon issuance of the solicitation. 4. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or because of discussions, will be considered further for participation in Step-Two. Each bid in the second step must be based on the bidder�s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal�s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder; however, the Government may request additional information from bidders that it considers reasonably susceptible of being made acceptable and may discuss bids with the prospective bidders. 5. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. 6. Bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids. Technical acceptability for step-one will be determined by the bidder�s response to the following questions. Technical requirements are as follows: Technical expertise: Describe your expertise with conducting an overhaul or repair of the Relay Assembly for the UH-60 or a similar assembly. Focus your response to include details that demonstrate the extent of your expertise and how you acquired it. Please include the quantity and frequency. If not, have you performed an overhaul, or repair, on the same, or like item in the past? a. If yes, to either question, when, for how long, in what quantity, and what specific item? b. If it was under a military contract, what is the contract number? c. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information. Please provide contact information for the Defense Contract Management Agency (DCMA) that served as your administrative contracting officer. d. What certifications and experience do your employees have to qualify them to perform the work? Provide all certifications relevant to the M&O program. Special testing equipment: Do you have the Original Equipment Manufacturer�s test equipment (OEM) equivalent test equipment for the Relay Assembly? a. If it is equivalent test equipment, was it certified as equivalent with a release for production certificate? If yes, please provide a copy of the certificate. b. If you do not possess of OEM or equivalent test equipment, and plan to reverse engineer this test equipment, do you have internal procedures to certify for equivalency and release for production? If so please describe. Engineering approach: Do you have an overhaul plan for the Relay Assembly? If yes, provide a copy. The plan must be in accordance with all requirements contained in DMWR 1-5945-213, dated 05JUL2011, and Maintenance Engineering Orders B1149, B2911, B2912, and B2913. If you only have a plan for a like item, ensure it contain instructions and procedures covering the following major categories, at a minimum: a. Receiving inspection and testing instructions. b. Disassembly instructions. c. Inspection instructions. d. Repair, and replacement instructions. e. Assembly instructions. f. Final testing and evaluation procedures. Can your company acquire all necessary components to complete an overhaul? If you have worked with the OEM for the relay assembly, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for OEM, or approved supplier, parts, or materials. Do you have a quality plan in place? If so, please provide a copy. No telephone requests for the solicitation will be accepted. This requirement is currently unfunded. The solicitation will be posted on SAM.gov/Home. Award will be withheld pending receipt of sufficient funds. SET-ASIDE CODE: N/A
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/af8ef72f4eb54d358c0a93a072c80209/view)
 
Place of Performance
Address: TBD
 
Record
SN06605327-F 20230303/230301230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.