Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 03, 2023 SAM #7766
SOLICITATION NOTICE

45 -- REPLACE WATER HEATERS

Notice Date
3/1/2023 10:39:08 AM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
FCC COLEMAN COLEMAN FL 33521 USA
 
ZIP Code
33521
 
Solicitation Number
15B30223Q00000003
 
Response Due
3/10/2023 12:00:00 PM
 
Archive Date
03/25/2023
 
Point of Contact
Daniel Frederick, Phone: 3526893163, Todd Large, Phone: 3526893030
 
E-Mail Address
dfrederick@bop.gov, TLarge@bop.gov
(dfrederick@bop.gov, TLarge@bop.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
DESCRIPTION OF REQUIREMENT FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA PROJECT 23Z3AL1 REPLACE WATER HEATERS ����������������������������������������������������������������������� 1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS INTRODUCTION� � � � � � � � � � �� ����������������������������������������������������������������������������������������������������������������������������������������������� The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement.� Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. �This contract will consist of supply only. BACKGROUND INFORMATION The FCI Low component of the FCC Coleman complex is in need of new water heaters to replace failed domestic water heaters at the A housing unit of the FCI Low. ���� GOVERNMENT FURNISHED PROPERTY FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved.� All other items and expenses should be included with the vendor�s quote. D.� DESCRIPTION OF REQUIREMENT ����������� FCC Coleman requires the vendor awarded this contract to provide the following equipment: 3 quantity - Rinnai Demand Duo� H-Series Hybird Design domestic water heater, model # CHS398100HiN, or approved equal that meets or exceeds the requirements below: Hybrid Design uses 119-gallon tank (398,000 BTU total) Natural gas Water heater shall be the horizontal double unit type. First Hour Delivery up to 551 gallons @ 100(degrees)F T 97% Thermal efficient CU199 Ultra-Low NOX compliant Temperature range of 98�F - 185�F Recovery rate at 100�F ?T 459 gph or greater ENERGY STAR tank design produces no thermal stress on tank Optimized pump design for increased flow and faster recovery DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required Gas Swivel Flex Line rotates 360(degrees) allowing 36""-long, 180(degrees) radius to connect to gas supply line Factory installed gas dirt leg, electrical access, and preassembled condensate drain AHRI certified UEF up to 0.93 efficiency Standard integrated controller MCC-91-2US Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed Shall include a water flow sensor, electronic water control and bypass control Electrical requirements shall be 120V, 60Hz. Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star� Storage tank shall have: 2� eco-friendly foam insulation Glass-lined inner tank 1-1/2� MNPT dielectric hot and cold connections Pre-installed temperature and pressure relief valve. Brass drain valve Dual magnesium anode rods Hand hole clean-out Tank shall be a hybrid option using an engine to heat the water and not a burner and coil inside the tank to heat the water. Tank shall not exceed 119-gallon storage capacity. Required safety devices included on the unit shall be: Flame Failure-Flame Rod Boiling Protection Combustion fan RPM Check Over Current-Glass Fuse Remaining Flam (OHS) Automatic Freeze Protection Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts. Water heaters to have built-in redundancy so as not to be completely without hot water should one of the three units fail. Water heater and tank shall be assembled in the USA All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor�s bid.� Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government. Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager. Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse. DESCRIPTION OF REQUIREMENT FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA PROJECT 23Z3AL1 REPLACE WATER HEATERS January 24, 2023 ����������������������������������������������������������������������� 1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS INTRODUCTION������������������������������ ����������������������������������������������������������������������������������������������������������������������������������������������� The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement.� Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. �This contract will consist of supply only. BACKGROUND INFORMATION The FCI Low component of the FCC Coleman complex is in need of new water heaters to replace failed domestic water heaters at the A housing unit of the FCI Low. ���� GOVERNMENT FURNISHED PROPERTY FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved.� All other items and expenses should be included with the vendor�s quote. D.� DESCRIPTION OF REQUIREMENT ����������� FCC Coleman requires the vendor awarded this contract to provide the following equipment: 3 quantity - Rinnai Demand Duo� H-Series Hybird Design domestic water heater, model # CHS398100HiN, or approved equal that meets or exceeds the requirements below: Hybrid Design uses 119-gallon tank (398,000 BTU total) Natural gas Water heater shall be the horizontal double unit type. First Hour Delivery up to 551 gallons @ 100(degrees)F T 97% Thermal efficient CU199 Ultra-Low NOX compliant Temperature range of 98�F - 185�F Recovery rate at 100�F ?T 459 gph or greater ENERGY STAR tank design produces no thermal stress on tank Optimized pump design for increased flow and faster recovery DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required Gas Swivel Flex Line rotates 360(degrees) allowing 36""-long, 180(degrees) radius to connect to gas supply line Factory installed gas dirt leg, electrical access, and preassembled condensate drain AHRI certified UEF up to 0.93 efficiency Standard integrated controller MCC-91-2US Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed Shall include a water flow sensor, electronic water control and bypass control Electrical requirements shall be 120V, 60Hz. Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star� Storage tank shall have: 2� eco-friendly foam insulation Glass-lined inner tank 1-1/2� MNPT dielectric hot and cold connections Pre-installed temperature and pressure relief valve. Brass drain valve Dual magnesium anode rods Hand hole clean-out Tank shall be a hybrid option using an engine to heat the water and not a burner and coil inside the tank to heat the water. Tank shall not exceed 119-gallon storage capacity. Required safety devices included on the unit shall be: Flame Failure-Flame Rod Boiling Protection Combustion fan RPM Check Over Current-Glass Fuse Remaining Flam (OHS) Automatic Freeze Protection Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts. Water heaters to have built-in redundancy so as not to be completely without hot water should one of the three units fail. Water heater and tank shall be assembled in the USA All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor�s bid.� Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government. Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager. Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/93ac5d0398bc4c3ba966b6de83bce74e/view)
 
Place of Performance
Address: Coleman, FL 33521, USA
Zip Code: 33521
Country: USA
 
Record
SN06605466-F 20230303/230301230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.