Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 04, 2023 SAM #7767
SOLICITATION NOTICE

Y -- Recreation Site Improvements, Chequamegon/Nicollet NF

Notice Date
3/2/2023 10:25:21 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, CSA EAST 13 Atlanta GA 303092449 USA
 
ZIP Code
303092449
 
Solicitation Number
12445523R0006
 
Response Due
3/13/2023 11:00:00 AM
 
Archive Date
03/28/2023
 
Point of Contact
Clark A. Bartelt, Phone: 2186264353
 
E-Mail Address
clark.a.bartelt@usda.gov
(clark.a.bartelt@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please see attached amendment 0003 Please see attached amendment 0002 and plans and specifications for Luna-White Deer location. Please see attached amendment 0001 for a question and answer. VALHALLA RECERATION AREA TRAIL REALIGNMENT AND SITE IMPROVEMENTS THE SCOPE OF WORK INCLUDES CLEARING AND GRUBBING, INSTALLATION OF NEW CULVERTS, AGGREGATE SURFACE AND SHOULDERS FOR ROADWAYS AND PARKING AREAS, ATV/SNOWMOBILE TRAIL, FENCING, BONFIRE PIT, ROOF SNOW GUARDS, AGGREGATE SURFACE PATIO, SIGNAGE, KIOSKS, REMOVAL OF A LIGHT AND POLE, ELECTRICAL CONDUIT ABANDONMENT, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. � WANOKA CAMPGROUND ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF NEW CULVERTS, ASPHALT PAVEMENT REMOVAL, ASPHALT PAVEMENT, RECONDITIONING OF DITCHES, SHOULDERS, AND AGGREGATE SURFACE, LANDSCAPING, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RELOCATING A VAULT TOILET TO THE CAMPGROUND AND RELATED CLEARING AND GRUBBING. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR CONSTRUCTION OF AN OVERFLOW PARKING AREA AND RELATED CLEARING AND GRUBBING. WANOKA CAMPGROUND IMPROVEMENTS (OBI) THE SCOPE OF THIS PROJECT IS TO PROVIDE A DEDICATED ELECTRICAL SERVICE AND A WASTEWATER HOLDING TANK AT HOST SITE NUMBER 4. PICNIC POINT CAMPGROUND ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPE, INSTALLATION OF A NEW CULVERT, PAVEMENT REMOVAL AND REPLACEMENT, SIGNAGE REMOVAL AND REPLACEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. THE SCOPE OF WORK ALSO INCLUDE OPTIONAL WORK FOR RECONSTRUCTION OF THE BOAT RAMP. PICNIC POINT CAMPGROUND VAULT TOILET REPLACEMENT (OBI) SCOPE OF WORK INCLUDES REMOVING 1 SINGLE-USER VAULT TOILET FROM SITE AND ISNTALLING 1 CXT DOUBLE CASCADIAN (OR EQUIVALENT) DOUBLE VAULT TOILET IN THE FOOTPRINT OF THE REMOVED STRUCTURE. LUNA-WHITE DEER CAMPGROUD ROAD RECONDITIONING AND REPAVING THE SCOPE OF WORK INCLUDES REMOVAL OF CORDUROY AND EXCAVATION BELOW SUBGRADE, REMOVAL OF THE EXISTING CULVERT PIPES, INSTALLATION OF A NEW CULVERTS, PAVEMENT FULL DEPTH RECLAMATION AND ASPHALT PAVEMENT, AND PLACEMENT OF EROSION CONTROL AND SLOPE PROTECTION. Project Magnatude is estimayed between $1M and $2M. This project is a total small business set-aside under NAICS code 237310, size standard $40.5M�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/847577ed815248f0b42acaf54b129adb/view)
 
Place of Performance
Address: Park Falls, WI 54552, USA
Zip Code: 54552
Country: USA
 
Record
SN06606631-F 20230304/230302230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.