SOURCES SOUGHT
Y -- CA ERFO NP SEKI 2021-1(1) Generals Highway Wall Repairs
- Notice Date
- 3/2/2023 12:55:08 PM
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23SS0018
- Response Due
- 3/16/2023 1:00:00 PM
- Point of Contact
- CFL Acquisitions
- E-Mail Address
-
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
- Description
- THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Josephine Helms) for receipt by close of business (2 p.m. local Denver time) on March 16, 2023:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service-Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). �This information must be provided in order to determine eligibility � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm�s capability to bond for a single project of $2 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value in which you performed (as the prime contractor) work in a national forest, national park, national monument and/or natural resource sensitive areas.?State whether your firm was the prime contract or subcontractor on the project.� DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.� This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.� A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT NUMBER:� CA ERFO NP SEKI 2021-1(1) PROJECT NAME: �Generals Highway Wall Repairs PROJECT DESCRIPTION:� This project includes emergency repairs to multiple sites on Generals Highway and Mineral King Road within Sequoia and King�s Canyon National Park from 2021 wildfires. The wildfires burned off wall facing, burned guardrail, caused burned trees to fall on/damage guardrail, and eroded embankment at a curb location. SCOPE OF THE WORK:� The primary scope of work is reinforced shotcrete facing of 8 Mechanically Stabilized Earth (MSE) walls, curb repairs at one location, and various guardrail repairs. Guardrail repairs include removal of damaged rail/blocks/posts, replacement of rail/blocks/posts, and installation of new guardrail and terminals. PRINCIPAL WORK ITEMS: 56603-0000 Reinforced Shotcrete: 2,210 SQYD (includes coloring) 60101-0000 Concrete: 45 CUYD (concrete footing for shotcrete facing) 61702-1500 Terminal Section, Type MGS Tangent: 5 EACH 63501-0000 Temporary Traffic Control: LPSM ANTICIPATED SCHEDULE:� Advertisement: April 2023 Contract Award: June 2023 Notice to Proceed: July 2023 Construction Complete: October 2023 ESTIMATED COST RANGE:� Schedule A estimated total cost is $700,000 - $2,000,000. MISCELLANEOUS: Sequoia and King�s Canyon National Park will have multiple construction projects active during the anticipated construction season. Temporary traffic control coordination between projects with the park will be crucial. Reinforced shotcrete wall facing is the majority of the work of this project. The sites are somewhat spread out along Generals Highway. Some work is in higher elevations that receive considerable snow (primarily guardrail and curb repairs), while other sites are at lower elevations and do not have seasonal weather concerns. Timing of work among these sites related to seasonal weather should be considered. The wall work is all within 2 miles of each other (between mileposts 4 and 6). Guardrail work occurs between mileposts 3 and 39. The curb repair location is between mileposts 44 and 45. The curb repair location includes, but is not limited to, debris removal, existing curb removal, installation of new curb, new riprap, and asphalt paved ditch. The guardrail work is primarily replacing small quantities of damaged items, such as rail, posts, and blocks. Some terminal sections need replacing. There is one stretch of guardrail to be fully replaced. Guardrail is to be fixed/replaced in-kind. Temporary traffic control will generally be single lane closures.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/61c2a36d2ee14ca9a76f598414369a62/view)
- Place of Performance
- Address: Kings Canyon National Pk, CA 93633, USA
- Zip Code: 93633
- Country: USA
- Zip Code: 93633
- Record
- SN06607449-F 20230304/230302230119 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |