SOLICITATION NOTICE
Y -- CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road
- Notice Date
- 3/7/2023 11:58:17 AM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23B000014
- Response Due
- 3/22/2023 1:00:00 PM
- Point of Contact
- Sheri Walsh
- E-Mail Address
-
CFLContract@dot.gov
(CFLContract@dot.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- THIS IS NOT A REQUEST FOR BIDS PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME PROJECT NUMBER:� CA ERFO FS LSPDR 2021-1(1) PROJECT NAME: ��NACIMIENTO-FERGUSSON ROAD PROJECT DESCRIPTION:� The Los Padres National Forest (LPNF) sustained significant damage to transportation facilities, including roadway embankments and drainage items during the 2021 Heavy Precipitation and Flooding event. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to repair the damaged facilities utilizing Emergency Repair for Federally Owned Roads (ERFO) funds. The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA. The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements. SCOPE OF THE WORK:� The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design.� Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated.� Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites. Items worth noting: The terrain is mountainous with steep slopes. The roadway widths vary from 16-ft to 24-ft. The road is currently closed to the public.� However, residents along the route do have access. The roadway serves as the primary route between King City and the Pacific Coast. Access for the residents will be maintained during construction. Shoring is anticipated for MSE wall excavations and to allow access. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 2,500 CUYD of Excavation/Embankment Construction������ 2,200 SQFT of Mechanically Stabilized Earth wall 220 CUYD of Riprap 700 TON of Roadway Aggregate 650 TON of Asphalt Pavement��������������������� 3 EACH of Concrete Headwall 150 LNFT of 24-inch Culvert 80 LNFT of 36-inch Culvert 150 LNFT of 78-inch Culvert 110 LNFT of 72-inch Culvert 9 EACH End Section for Culverts 120 hours of Equipment Hours���������� 1 (LPSM) Traffic Control ANTICIPATED SCHEDULE:� Advertise:��March 2023 Award:��April 2023� Construction:��May 2023 � December 2023� ESTIMATED COST RANGE:� The anticipated cost range is�between $10,000,000 and $20,000,000.� FUNDING SOURCE:� Emergency Relief for Federally Owned (ERFO) Roads Program funds the project. MISCELLANEOUS: �Wet winter weather can be expected to commence in December making construction unlikely after the first half of the month.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/7472710dd76f487393889c4512e3ddc6/view)
- Place of Performance
- Address: King City, CA 93930, USA
- Zip Code: 93930
- Country: USA
- Zip Code: 93930
- Record
- SN06610682-F 20230309/230307230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |