Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 09, 2023 SAM #7772
SOLICITATION NOTICE

Y -- San Juan Harbor Construction and Maintenance Dredging, 44-Foot and 36-Foot Project, San Juan, Puerto Rico

Notice Date
3/7/2023 11:01:05 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-0019 USA
 
ZIP Code
32207-0019
 
Solicitation Number
W912EP23B0008
 
Response Due
4/6/2023 10:00:00 PM
 
Archive Date
03/06/2024
 
Point of Contact
Adeline Fuata, Phone: 9042321692, Anelis Nazario Castillo, Phone: 904-232-3285
 
E-Mail Address
adeline.f.fuata@usace.army.mil, anelis.i.nazario-castillo@usace.army.mil
(adeline.f.fuata@usace.army.mil, anelis.i.nazario-castillo@usace.army.mil)
 
Awardee
null
 
Description
Work associated with the requirement consists of construction and maintenance dredging in designated areas of deepening and widening of the Federal navigation channel and Puerto Rico Ports Authority (PRPA) berthing areas. The project work includes deepening Cut-6 of the entrance channel to a required depth of 47 feet, deepening the Anegado Channel to a required depth of 45 feet, the Army Terminal Channel, and the Army Terminal Turning Basin to a required depth of 46 feet, deepening the Federal channels adjacent to the cruise ship terminals, to include the San Antonio Approach Channel, the San Antonio Channel, the Cruise Ship Basin East, and the Cruise Ship Basin West to a required depth of 37 feet. Project work will also include maintenance dredging of areas within the Puerto Nuevo Channel, Puerto Nuevo Turning Basin, Graving Dock Channel and Anchorage Area - E to required depths ranging from 36 feet to 39 feet. The project widening involves constructing 50 feet of new channel on both sides of Army Terminal Channel to increase the total channel width by 100 feet from 350 feet to 450 feet, and eastern and western flares at the intersection of the southern terminus of the Army Terminal Channel and the Army Terminal Turning Basin. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All maintenance dredging areas will incorporate +2 feet of allowable overdepth. Project work also consists of dredging the PRPA Cruise and Pan American berthing areas and the PRPA berthing areas located adjacent to the Army Terminal Turning Basin. All dredged material will be disposed of in the San Juan Ocean Dredge Material Disposal Site (ODMDS) located approximately 2.3 nautical miles from the northern end of Cut-1. Said work, which will be performed in San Juan, Puerto Rico, and divided into a base and two options, is also inclusive of, but not limited to, environmental species monitoring, turbidity monitoring and vibration monitoring
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0571f2d86a364296a64f5e0e4ce3708a/view)
 
Place of Performance
Address: San Juan, PR, USA
Country: USA
 
Record
SN06610688-F 20230309/230307230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.