Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 12, 2023 SAM #7775
SOURCES SOUGHT

99 -- Maintenance Dredging of Newark Bay � -50ft., -40ft. and -35ft. Reaches, New Jersey Federal Navigation Project

Notice Date
3/10/2023 8:26:36 AM
 
Notice Type
Sources Sought
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS23S0026
 
Response Due
3/24/2022 11:00:00 AM
 
Point of Contact
Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
Nicholas.P.Emanuel@usace.army.mil
(Nicholas.P.Emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the Newark Bay, New Jersey, Federal Navigation Project. The dredged material would be processed and subsequently transported to and placed at a contractor furnished, State permitted upland placement site(s). The proposed maintenance dredging would remove approximately 280,000 cubic yards (CY) of selected critical shoals from the Main and Port Newark Channels of Newark Bay. Dredging in these channels would be required to depths of -50 feet, -40 feet, and -35 feet Mean Lower Low Water (MLLW) plus 1 foot allowable over-depth. The dredged material is expected to consist primarily of silt and clay. Due to anticipated restrictions found in the New Jersey Department of Environmental Protection Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple barges and tugboats will be needed to perform the work during the dredging, dewatering and unloading operations. The dredged material would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the placement site is located. All necessary permits required for the dredged material placement will be provided by the contractor to the government. The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and maintain an integrated production rate of at least 2,500 cubic yards per calendar day for the dredging, transportation, transfer, dewatering, processing, and final placement of the material. The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place between July 2023 and February 2024. The work is estimated to cost between $25,000,000 and $100,000,000. SURVEY OF THE DREDGING INDUSTRY The following is a confidential survey questionnaire designed to apprise USACE of prospective dredging contractors� project execution capabilities. Please provide your response to the following questions. All questions are regarding the Newark Bay, NJ maintenance dredging project. General 1) Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number. 2) What percentage of work (volume of material dredged, transported, dewatered, processed, and ultimately placed) can you perform with your own equipment? 3) Do you have experience with the placement of dredged material at contractor furnished, state-permitted upland placement sites? Please list your experience including the processing and placement sites used to place the material. 4) Have you performed dredging within the waters of the Port of New York and New Jersey? 5) Would you be willing to bid on the project previously described? If the answer is No, please explain why not? 6) Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture? 7) Is there a dollar limit on the size contract that you would bid? If so, what is that limit? 8) What is the largest dredging contract, in dollars, on which you were the prime contractor? 9) What is your bonding capacity per contract? What is your total bonding capacity? 10)Do you have experience using the USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging reports and Pay Estimates? 11)Do you have experience applying the USACE EM 385-1-1 (Nov 2014) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes. Equipment 1) What type of dredge equipment do you own and / or operate that is suitable for the work described? Do you own a closed environmental clamshell bucket? Please list each piece of equipment capable of performing each type of work described, i.e. dredging, transfer, transportation, dewatering and/or other processing, and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics. 2) Identify which dredge(s), including support equipment (tug, scows, etc), you would employ on this project. Also, for each dredge, identify the digging depth. 3) Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean-going, sealed hull, etc) and the capacity. 4) Will you be able to meet a production rate of 2,500 cubic yards per calendar day, with placement at a contractor furnished, state permitted upland placement site(s)? 5) Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box/Silent Inspector) or employing a Dredged Material Inspector (DMI)?
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e3deaf75261d48829ab34d576845b64f/view)
 
Record
SN06615332-F 20230312/230310230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.