Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 16, 2023 SAM #7779
SOLICITATION NOTICE

Y -- P-1238 CONSTRUCTION OF GRID STABILITY & RESILIENCY 10 MW BATTERY ENERGY STORAGE, VARIOUS BUILDINGS AT MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

Notice Date
3/14/2023 10:46:58 AM
 
Notice Type
Solicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
NAVFAC SOUTHWEST SAN DIEGO CA 92132-5000 USA
 
ZIP Code
92132-5000
 
Solicitation Number
N6247322R4005
 
Response Due
4/12/2023 2:00:00 PM
 
Archive Date
04/27/2023
 
Point of Contact
Vincent Nazzal
 
E-Mail Address
vincent.p.nazzal.civ@us.navy.mil
(vincent.p.nazzal.civ@us.navy.mil)
 
Description
The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 MW of battery energy storage systems (BESSs) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESSs shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the Project P-1238 Construction of Grid Stability & Resiliency 10 MW Battery Energy Storage, Various Buildings at Marine Corps Air Ground Combat Center, Twentynine Palms, California�� Apr 15, 2022 12:03:02 AM GMT 1 installation's electric distribution system for utility power or on-site cogeneration system charging. The BESSs will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESSs into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESSs capable of parallel operation, each located in proximity to existing PV systems.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/15ac5f5806614bcea8db3bbc5e07a548/view)
 
Place of Performance
Address: Twentynine Palms, CA 92277, USA
Zip Code: 92277
Country: USA
 
Record
SN06617558-F 20230316/230314230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.