Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 17, 2023 SAM #7780
SOURCES SOUGHT

E -- ES-23-01044 - Waterproofing and Caulking Market Research

Notice Date
3/15/2023 10:03:55 AM
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
697DCK REGIONAL ACQUISITIONS SVCS FORT WORTH TX 76177 USA
 
ZIP Code
76177
 
Solicitation Number
697DCK-23-R
 
Response Due
3/23/2023 2:00:00 PM
 
Archive Date
03/25/2023
 
Point of Contact
Wayne Mottley
 
E-Mail Address
wayne.mottley@faa.gov
(wayne.mottley@faa.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The FAA is searching for 8(a) certified, Service Disable Veteran Owned,�Women Owned; HUB-zoned Small Business or other small business concerns qualified in NAICS 236220�as�its primary NAICS.� The contractor shall furnish all labor, supervision, supplies, materials,�tools, equipment, transportation, and any other incidental engineering the replacement of the caulking on the Islip MacArthur Air Traffic Control Tower (ATCT)shaft located in Islip NY. �A concrete sealer will be applied to the ATCT Shaft Precast Concrete.��� Where stated in this document that caulking is to be replaced, remove all exiting caulking, prepare the existing surface as per manufacturer�s requirements and replace the caulking as per the requirements of the contract and manufacturer�s specifications. �This project will require the use of an aerial lift. �The contractor shall follow all applicable safety regulations (local, FAA and OSHA) for fall protection at all times. �The height to reach the upper levels of the required work is approximately 135 foot above grade. The contractor is required to attend a site visit. �The site visit provides the opportunity for the contractor to determine the site restrictions (available property, roadways, facility base building, etc.), the height of the required aerial lift and for the contactor to verify all quantities, linear feet (LF) of caulking to be replaced. Prior to starting construction, the contractor shall perform a manufacturer�s adhesion test with the building sealant (caulking) for our site condition. �After this test the contractor will determine what the installation requirements are. �The contractor shall provide a manufacturer�s 20-year written warranty for the building sealant (caulking) installed. �The minimum thickness of the caulking joint shall equal � the width of the caulk joint. �Replace the caulking backer rod as required. �Ensure that all backer rod is set at a depth to provide the required thickness of caulking. �The contractor shall confirm all quantities of caulking to be replaced and site conditions affecting the height of the aerial lift required before submitting their bid. �All debris generated shall be cleaned up and disposed of at the end of each work shift. �The contractor shall restore all grass areas of the site after construction (provide topsoil and grass seed). �Prior to construction, the contractor shall meet with the FAA Resident Engineer and review and complete the� FAA PRE-CONSTRUCTION AND MAINTENANCE PROJECT SAFETY AND HEALTH CHECKLIST.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/602dda6aad1c48df8dbb085cd799a4f0/view)
 
Place of Performance
Address: Islip, NY 11706, USA
Zip Code: 11706
Country: USA
 
Record
SN06619981-F 20230317/230315230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.