Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 19, 2023 SAM #7782
SOURCES SOUGHT

99 -- CUIR Subproject 1 Commissioning Agent Services

Notice Date
3/17/2023 2:35:34 PM
 
Notice Type
Sources Sought
 
NAICS
541330 — Engineering Services
 
Contracting Office
SLAC Natl Accel Lab -DOE Contractor Menlo Park CA 94025 USA
 
ZIP Code
94025
 
Solicitation Number
RFP_335873
 
Response Due
3/24/2023 5:00:00 PM
 
Archive Date
03/24/2023
 
Point of Contact
Matt Mezzetta
 
E-Mail Address
mezzetta@slac.stanford.edu
(mezzetta@slac.stanford.edu)
 
Description
THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest on the SAM.GOV posting, Interested Vendors List, or by emailing the Procurement Specialist for this project. Title: CUIR Subproject 1 Commissioning Agent Services 1) Purpose SLAC�s Critical Utilities Infrastructure Revitalization (CUIR) project team is seeking services of a Certified Commissioning Professional (CCP), NETA or NICET certified preferred, for the CUIR project located at the SLAC National Laboratory at 2575 Sand Hill Rd., Menlo Park, California to partner with and act as an experienced, knowledgeable commissioning agent (CxA). The CxA shall develop and implement a systematic commissioning process for achieving, verifying, and documenting the interactive performance of facilities or systems and their various components within areas of the CUIR project scope. The commissioning process should meet the latest CUIR Project Requirements (PR), which will be provided at the time of scope authorization and subsequent change requests. To ensure the commissioning process meets design intent, and the functional and operational needs of SLAC, SLAC will retain the CxA during the CUIR preliminary design phase to assist the CUIR project team with establishing clear project commissioning goals and expectations, documenting the design intent and continuing through construction, acceptance, and warranty periods with actual verification of performance, operation, and maintenance (O&M) documentation along with training of operating personnel as applicable. 2) Background CUIR will revitalize and modernize electrical, mechanical, domestic water/fire protection, sanitary sewer, storm drain, and natural gas utility systems to support scientific discovery and foster safe, reliable, efficient, and environmentally sustainable operations to mitigate risks resulting from aging infrastructure on new buildings and advanced scientific research needs. CUIR is organized into three (3) subprojects to address requirements in an efficient fashion that aligns with lab priorities, operational downtimes to perform construction activities, and sequencing of construction activities. This Statement of Work is focused on the first subproject: Subproject 1 (SP1) � Critical Electrical Work. Subproject 1 (SP1) - Critical Electrical Work is planned to include major electrical system upgrades and modernization scope to fulfil the project requirement (PR) available at this time - CUIR Electrical Requirements document (CUIR-RQ-0035-R3). Subproject 1 is currently undergoing preliminary design with the intent to complete construction of the planned scope as Design-Build and/or Design-Bid-Build method.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2d3d9551124640339f5b86155fdb7291/view)
 
Place of Performance
Address: Menlo Park, CA 94025, USA
Zip Code: 94025
Country: USA
 
Record
SN06622900-F 20230319/230317230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.