SOLICITATION NOTICE
Y -- WY FLAP CR CN10-277(1) Wiggins Creek Bridge
- Notice Date
- 3/29/2023 12:45:53 PM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF23B000018
- Archive Date
- 04/14/2023
- Point of Contact
- Leslie Karsten
- E-Mail Address
-
CFLContracts@dot.gov
(CFLContracts@dot.gov)
- Small Business Set-Aside
- HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- Description
- THIS IS NOT AN INVITATION FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER:� WY FLAP CR CN10-277(1) PROJECT NAME: �WIGGINS CREEK BRIDGE PROJECT DESCRIPTION:� The project is in Fremont County, Wyoming along the East Fork Road, approximately 6 miles north of the intersection with U.S Highway 26. The nearest town is Dubois Wyoming located approximately 15 miles west of the project location. The terrain is mountainous with an elevation of approximately 6700 feet. This project is for bridge replacement. SCOPE OF THE WORK:� The project includes removal of a one-lane bridge. A one lane diversion will be required before the removal of the existing bridge can begin as the roadway must remain open throughout the project. The creek is a sensitive resource area for the Yellowstone cutthroat trout and Brown trout. The construction season that is currently anticipated is that most work will be performed in late summer and through the winter to minimize the impact to the fisheries. There will be some level of public scrutiny as there are three private properties that are adjacent to the bridge. PRINCIPAL WORK ITEMS: The major items of work include the following: Removal of bridge (LPSM) Cofferdams (LPSM) Structural Concrete, Class A (AE) � 150 (CUYD) Reinforcing Steel � 21,700 (LB) Reinforcing Steel, Epoxy Coated � 13,000 (LB) Prefabricated steel bridge (100�x 29� Modular Steel Vehicular Bridge) (LPSM) Bridge Railing, Steel (WYDOT TL-3) � 290 (LNFT) Drilled Shaft, 30-inch diameter � 250 (LNFT) Construction and maintenance of diversion (LPSM) ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in April 2023, with NTP in late June 2023. Construction is anticipated from July 2023 thru October 2024. No in-water work can occur between May 15th and July 31st to avoid the Yellowstone cutthroat trout spawning and no in-water work between September 15th through November 30th to avoid brown trout spawning. ESTIMATED COST RANGE:� The estimated price range of the project work is between: $2,000,000 and $5,000,000 FUNDING SOURCE:� The project is funded through the FLAP program which includes a portion of the project being funded through match from Fremont County.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d5b05479f3864365ad381abe50a8e28b/view)
- Place of Performance
- Address: Dubois, WY, USA
- Country: USA
- Country: USA
- Record
- SN06633568-F 20230331/230329230105 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |