SOLICITATION NOTICE
Y -- West Sac Yolo Bypass - South Improvement Project
- Notice Date
- 3/30/2023 10:24:20 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
- ZIP Code
- 95814-2922
- Solicitation Number
- W9123823B0010
- Response Due
- 4/5/2023 9:00:00 AM
- Archive Date
- 04/28/2023
- Point of Contact
- Jeffrey POST, Phone: 9165576959, MELISSA DENIGRIS, Phone: 916-557-5137
- E-Mail Address
-
jeffrey.m.post@usace.army.mil, MELISSA.A.DENIGRIS@USACE.ARMY.MIL
(jeffrey.m.post@usace.army.mil, MELISSA.A.DENIGRIS@USACE.ARMY.MIL)
- Awardee
- null
- Description
- The West Sac Yolo Bypass - South improvement project is located in West Sacramento, California and includes the construction of approximately 2,400 feet of a combination stability/seepage berm and approximately 6,150 feet of rock slope protection. The City of West Sacramento is located in Yolo County, CA. It is bordered by the Sacramento River to the north and east, and the Yolo Bypass to the w est. The city relies upon a levee system to prevent flooding during high water events. The current project includes two work sites, on two segments of the Yolo Bypass East Levee (YBEL). These levee segments have been identified as deficient due to stability, seepage, and encroachments/penetrations. Work will include construction of a combination stability/seepage berm, levee repairs of the landside embankment. NAICS:237990 ? Other Heavy and Civil Engineering Construction. PSC: Y1LC ? Construction of Tunnels and Subsurface Structures. Disclosure of Magnitude: In accordance with FAR 36.204(g), the estimated magnitude of construction is expected to be between $5,000,000 and $10,000,000. This is an unrestricted solicitation. A Subcontracting Plan will be required if the apparent low bidder is a large business. Please follow the instructions to bidders set forth in this solicitation.~~Post the Sign in Roster for Site Visit conducted on 2023-03-02.~~PIEE Amendment 0002/Amendment 0001: Revise the Specifications, Plans, Price Schedule and update the DOL Wage Determination Rates. ~~PIEE Amendment 0003/Amendment 0002: Revise the specifications. Wage Determination remains the same (3/17/2023).~~PIEE Amendment 0004/Amendment 0003: Revise the plans, Wage Determination remains the same (3/17/2023). The due date remains the same at 5/4/2023 at 9:00 am.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/426459b8975a44ab8c0f939c8397bf88/view)
- Record
- SN06635270-F 20230401/230330230110 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)