SOLICITATION NOTICE
Z -- South Cottonwood Bridge Replacement
- Notice Date
- 3/30/2023 9:21:24 AM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- USDA-FS, CSA INTERMOUNTAIN 8 Ogden UT 844012310 USA
- ZIP Code
- 844012310
- Solicitation Number
- 1240LT23R0017
- Response Due
- 4/28/2023 2:00:00 PM
- Archive Date
- 06/30/2023
- Point of Contact
- Lonnie Root, Jose Gutierrez
- E-Mail Address
-
lonnie.root@usda.gov, jose.gutierrez4@usda.gov
(lonnie.root@usda.gov, jose.gutierrez4@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Update 03/30/2023: The purpose of the update is to correct the following verbiage on the solicitation: Page 4: The Intent of Solicitation should read: ""The purpose of Solicitation 1240LT23R0017 is to solicit a request for proposal for a single award FFP contract with an estimated magnitude between $500,000 and $1,000,000."" Page 5: C3 The Magnitude of Construction should read: ""The project has an estimated magnitude between $500,000 and $1,000,000."" All other terms and conditions remain unchanged. The U.S. Forest Service is soliciting offers for a single award, Firm-Fixed Price contract type with an estimated magnitude for the base and options between $500,000 and $1,000,000. The Government anticipates awarding a sole contract for the replacement of a bridge at South Cottonwood Creek in San Isabel National Forest in Buena Vista, CO.� Additional awards, at Forest Service discretion, may be considered depending on Forest Service need and results for proposal evaluations.� Prospective offerors are required to submit proposals in accordance with the forthcoming solicitation. Note: This solicitation is a re-solicitation of 1240LT22R0062. Scope of Work: The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Coordinate with the Upper Arkansas Water Conservancy District and the Cottonwood Lake Summer Group Homes to relocate their facilities as required. Install traffic control signing as required and move traffic to bypass. Remove the existing bridge. Remove trees and clear and grub as required. Excavate for footings. Construct the footings. Construct the abutments and wingwalls. Backfill the abutments to just below the beam seat elevation. Grade portions of the channel banks under the new bridge. Install riprap adjacent to the new structure. Erect the steel girders. Construct the concrete deck and end diaphragms. Construct the utility conduits. Construct the remaining backfill and approach embankments. Install the bridge rails. Install the approach rails. Open the road new road and bridge to traffic. This opportunity is set aside for total small businesses. Location(s): The bridge carries NFSR 344 over South Cottonwood Creek adjacent to the outlet from Cottonwood Lake. The bridge is located approximately 9.5 miles southwest of Buena Vista, Colorado in the San Isabel National Forest. Disclaimer: This notice does not commit the Government to contract for any supply or service. Respondents are advised that the United States (U.S.) Government will not pay for any information or administrative cost incurred in response to this notice. All costs associated with responding to this notice will be solely at the responding party's expense. Please be advised that all submissions become Government property and will not be returned. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/5838b072f6c54afab8170307a907dc14/view)
- Record
- SN06635316-F 20230401/230330230110 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |