Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 16, 2023 SAM #7810
SOLICITATION NOTICE

N -- Fort Randall Asbestos Tray Replacement

Notice Date
4/14/2023 11:29:52 AM
 
Notice Type
Presolicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F23B0007
 
Response Due
3/6/2023 12:00:00 PM
 
Archive Date
04/30/2023
 
Point of Contact
Brianna Boehne, Jessica R. Jackson
 
E-Mail Address
brianna.boehne@usace.army.mil, jessica.r.jackson@usace.army.mil
(brianna.boehne@usace.army.mil, jessica.r.jackson@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
**11 Jan 23 - Step-One IFB is expected to be available on or about 25 Jan 23. Site Visit rescheduled to 7 Feb 23 (tentative).� Details will be provided in the Step-One IFB.** The U.S. Army Corps of Engineers (USACE) Omaha District intends to issue a Two-Step Invitation for Bid (IFB) that will result in one (1) Firm Fixed-Price contract for the Asbestos Tray Replacement at Fort Randall Dam, South Dakota. The North American Industry Classification System (NAICS) Code is 238210, Electrical Contractors and Other Wiring Installation Contractors. Estimated Magnitude of Construction:� Between $1,000,000 and $5,000,000. PROJECT SCOPE:� This is a construction contract to remove and replace transite asbestos cable trays at Fort Randall Dam, SD. Work includes supporting the cables that rest in the existing trays until new cable trays are installed, unbolting the transite asbestos trays from supports, taking the trays out of the tunnels and preparing them to be lifted by crane through access hatches on the generator floor, and transport and dispose of the trays at an approved landfill. Once the trays have been removed, the cables and remaining horizontal surfaces shall be wiped down/cleaned for dust that contains asbestos fibers, with all waste to be properly disposed of. Suitable replacement cable trays will be supplied and installed under this contract. TWO-STEP PROCUREMENT: This solicitation and resulting contract are using a Two-Step Sealed Bidding procurement method as described in FAR Part 14.5. The two-step procedure is a combination of competitive procedures designed to obtain the benefits of sealed bidding while ensuring only technically acceptable firms participate in the priced sealed bid.� The process allows for the Step One technical proposal submission and evaluation to be performed concurrent with the development of the final 100% technical specifications and construction drawings. Step One ensures that only technically acceptable firms participate in the Step Two sealed bid process.�� The Step One solicitation, issued as a Request for Technical Proposal, is expected to be available on or about 25 January 2023 via Contract Opportunities at�https://sam.gov/. The submission requirements of Step One, Request for Technical Proposal, shall not include any prices or pricing information.� Bid bonds / guarantees are not required to be submitted with the Step One technical proposal.� Under this bidding process, Step One consists of the request for submission, evaluation and (if necessary) discussion of a technical proposal. Only one (1) technical proposal may be submitted by each offeror. The proposals will be evaluated for technical acceptability. Again, the technical proposal must not include prices or pricing information. A notice of �acceptable� or �unacceptable� will be forwarded to each Step One offeror upon completion of the technical proposal evaluation and final determination.� The names of the offerors that submitted acceptable technical proposals will be listed on the Government�s�https://sam.gov/�website for the benefit of prospective subcontractors. In Step Two, an amendment to the solicitation will be issued along with the final 100% technical specifications and construction drawings to only those offerors whose technical proposals are determined to be acceptable in Step One.� The normal sealed bidding process in FAR Part 14 will be followed in Step Two. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions for Step One, will be considered for award. Each bid in Step Two must be based on the bidder's own technical proposal that was submitted, evaluated and determined to be acceptable in Step One.� Bidders must comply with the 100% technical specifications and construction drawings and the bidder�s acceptable technical proposal. Bid bonds will be required to be submitted with the Step Two bid submission. Payment and Performance Bonds will be required for the full amount (100%) at the time of contract award before the Notice to Proceed (NTP) can be issued. A site visit is tentatively scheduled for 31 January 2023.� Detailed information will be included in the Step-One IFB. Interested prime contractors must have an active System for Award Management (SAM) registration. Firms can register via the SAM website at https://sam.gov/.� If an offeror is a Joint Venture (JV), the JV entity must have valid SAM registration in the SAM database representing the JV as one (1) business/firm/entity. The point of contact for all questions/inquiries is Contract Specialist Brianna Boehne at brianna.boehne@usace.army.mil.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/76742798922a499a93468e8fb9ec8faa/view)
 
Place of Performance
Address: Pickstown, SD 57367, USA
Zip Code: 57367
Country: USA
 
Record
SN06651225-F 20230416/230414230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.