SOLICITATION NOTICE
Z -- CGR Toronto Kitchen Cabinet and Countertop Replacement
- Notice Date
- 4/14/2023 12:18:43 PM
- Notice Type
- Presolicitation
- NAICS
- 236118
— Residential Remodelers
- Contracting Office
- AMERICAN CONSULATE TORONTO WASHINGTON DC 20520 USA
- ZIP Code
- 20520
- Solicitation Number
- 19CA7023Q0004
- Response Due
- 5/15/2023 1:00:00 PM
- Point of Contact
- Kelly Gerstbacher, Phone: 4165956531, Afrin Sarmin, Phone: 4165951700
- E-Mail Address
-
GerstbacherKA@state.gov, AfrinSL@state.gov
(GerstbacherKA@state.gov, AfrinSL@state.gov)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Description
- Draft SOW: STATEMENT OF WORK Cabinet & Countertop Replacement 16 March 2023 US Consulate General, Toronto, CGR Kitchen Restoration GENERAL: The US Consulate in Toronto has a requirement to renovate the kitchen in the designated Consul General�s residence, (CGR), at 152 Warren Road in Toronto. The work shall be done as per attached �Final Kitchen Design Concept� and statement of work. The contractor requires experienced trades persons to execute the work in accordance with Ontario building code requirements and manufacturer installation instructions. � The contractor shall provide all personnel, equipment, tools, supplies, materials, supervision, and transportation necessary to: Scope of Work General requirements. Remove old, furnish and install new cabinets, countertops, sinks, as per attached �Final Kitchen Design Concept� and general notes. Should there be a discrepancy between the general notes and this scope of work, this scope of work takes precedence. The contractor shall install masking from an entry point to the work-space area and install other masking as necessary. The US government will remove all appliances.� Contractor to install all existing and new appliances at final location. Appliances to include existing electric range, existing gas range, existing Hobart dishwasher, existing stainless steel commercial dishwasher, new over the range microwave, new warming drawer, existing refrigerators, one with water hook-up.� Hood fan to remain in place. �Cabinets & Countertops: Shall be installed in full accordance with manufacturer�s recommendations so as to preserve all warranties. PERFORMANCE PERIOD: Shall not exceed 30 days after issuance of notice to proceed (NTP). WORK HOURS: 7:00 AM to 2:30 PM Local Monday through Friday, excluding Federal Holidays. All dimensions in the concept drawings are approximate and are to be confirmed by the Contractor prior to ordering any products or materials. Cabinetry Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of the kitchen space receiving new cabinets and granite countertops Contractor to prepare the proper 20/20 cabinetry drawings for product orders, installation, etc. 20/20 is the program specific for cabinetry fabrication, supply & installation. Product Data: Contractor shall submit physical samples to customer prior to installation. 1. The contractor shall remove and dispose of offsite all existing cabinets that will be replaced. 2. Replace all upper cabinets & lower cabinets with the following specifications, a. KitchenCraft Cabinetry b. Layout as indicated �Final Kitchen Design Concept� c. Lexington door style https://www.kitchencraft.com/products/lexington d. Maple species in the Alabaster Painted Finish, Door & Drawer profile to match: 5-piece drawer construction e. Natural maple interior f. Full extension drawers with Blum hardware, Dovetail Drawer Construction, 13""D upper cabinets g. All plywood component cabinetry that meets ANSI/HPVA HP-1 standards h. �5/8� plywood sides and top and bottom i. fully concealed, six-way adjustable soft-closing hinge j. KCMA Quality Certified cabinets k. Contractor shall install toe kicks and end panels as necessary Countertop and backsplash Contractor shall install countertops Wilsonart � Quartz Marrara Q4026 (or similar) single slab, and backsplash 4�x 12� white subway tile applied horizontally, brick pattern 1/16� grout to match. �Product Data: Contractor shall submit physical samples to customer prior to installation. Plumbing Works Make any necessary adjustments for required supply and drainage piping for the work to be completed in the �Final Kitchen Design Concept.� Supply and install two new stainless-steel sinks and commercial grade faucets as indicted in the final kitchen design concept. Flooring Remove existing floor and install new floor with under floor electric heating as per manufacturer�s installation instructions, new floor Serrano Multi-Color porcelain tile (or similar � but must be non-slip) SKU 100505924 Size 12 x 24 Painting Paint includes painting and finishing of exposed interior item. �Paint� as used herein means all coating system materials including primers, emulsions, fillers, and other applied materials whether used as prime, intermediate, or finish coats. The extent of the paintwork is to paint all the damaged surfaces as a result of the work in this contract. Apply paint in accordance with manufacturer's instructions. Minimum of two coats. Electrical Electrical � new outlets required as per international electrical code or local code requirements whichever is more stringent. �ESA to inspect and contractor will be required to correct all work-related issues identified by ESA. All countertops will require GFCI protection. Remove receptacles and switches (and replace with new) as indicated final kitchen design concept and install new.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4d9e055f9b5a467995bbf930fcbb83c7/view)
- Place of Performance
- Address: Toronto, ON, CAN
- Country: CAN
- Country: CAN
- Record
- SN06651383-F 20230416/230414230110 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |