SOLICITATION NOTICE
Z -- VGLZ 162323: ADAL Fuel Cell & Corrosion Control, Bldg. 154
- Notice Date
- 4/14/2023 12:17:18 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- W7NF USPFO ACTIVITY MIANG 127 SELFRIDGE ANGB MI 48045-5213 USA
- ZIP Code
- 48045-5213
- Solicitation Number
- W50S8523B0004
- Response Due
- 6/6/2023 8:00:00 AM
- Archive Date
- 07/30/2023
- Point of Contact
- Steven Stocking, Phone: 5862394881, Anna Randall, Phone: 5862395526
- E-Mail Address
-
steven.stocking.2@us.af.mil, anna.randall.1@us.af.mil
(steven.stocking.2@us.af.mil, anna.randall.1@us.af.mil)
- Description
- This project will provide a renovation to the facility, with small additions to the office area to provide enhanced support areas/offices. The administration and support areas, including office spaces, break room, toilet and locker rooms, workshops, and utility rooms are reconfigured with full-height, nonload bearing CMU partitions separating the shop spaces and support areas. Full height wall tile shall be applied to the toilet/locker/shower rooms. Remaining walls will have paint or epoxy finishes. Flooring will include carpetedoffices, rubber tiles in the break area, tile floors in the toilet and locker rooms, and epoxy in the corridors and shop spaces. Existing storefront openings, entries, and windows are to be replaced. The additions will match the existing building and consist of insulated metal panel above a concrete masonry and brick wall base. The hangar bay work will be completed in two phases. The first phase will renovate the east bay while maintaining operability of the west bay, with the second phase renovating the west bay after the east bay is operational. The hangar floor will require a new epoxy floor system. New door fabric and electrical service and controls upgrades for the hangar doors are included to allow for door operation by emergency generator as well as fire department operation by key on the outside of the building. New fall protection systems will be provided over the aircraft locations in each bay. The exterior work for this project will include the demolition of the existing concrete containment area, Jet Fuel JP-8 equipment, landscape, asphalt and concrete pavement, and Utilities, including sanitary sewer, water main, storm sewer, and electrical equipment. This project will include the construction of two additions totaling 1,325-sf and the reconfiguration ofthe existing 17,650-sf Fuel Cell/Corrosion Control Facility. Proposed site improvements includemodifications to the existing parking lot to support the east addition. Utility improvement to include relocated sanitary sewer lines, relocated storm sewer mains, and a new fire protectionwater main line. A new oil-water separator will replace the existing system located near the northeast corner of the existing system.A new 54 ft. tall/300,000-gallon prefabricated steel water storage tank and a pumping station willbe built to supply water for fire suppression to future renovated and constructed Hangars 3, 4,and 5 and Building 154. The new pumping station will provide a new 10 inch water distributionloop to the new water-based fire suppression systems and fire sprinkler systems in each of theHangars H154, H3, H4 and H5. A stub connection will be provided in at each hangar for future connection to the fire pump-loop system improvements. These utility improvements will require removal and replacement of asphaltic and concrete pavement, along with curb and gutter replacement.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/832b73765dcb49a79316aedd0a92ab46/view)
- Place of Performance
- Address: Selfridge ANGB, MI 48045, USA
- Zip Code: 48045
- Country: USA
- Zip Code: 48045
- Record
- SN06651384-F 20230416/230414230110 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |