Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 22, 2023 SAM #7816
SOLICITATION NOTICE

R -- National Nursery Facilities Optimization Planning

Notice Date
4/20/2023 2:01:15 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
USDA FOREST SERVICE WASHINGTON DC 20250 USA
 
ZIP Code
20250
 
Solicitation Number
12318723R0011
 
Response Due
5/13/2023 9:00:00 AM
 
Archive Date
05/28/2023
 
Point of Contact
Juan ""Carlos"" Tapia, Phone: N/A, Fax: N/A, Jason King, Phone: 2026972097
 
E-Mail Address
juan.tapia@usda.gov, jason.king@usda.gov
(juan.tapia@usda.gov, jason.king@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The FS National Nursery System FMP will be used to create a dynamic and flexible interdependent nursery system. Nursery investments shall be evaluated in a holistic manner where improvements are positioned and prioritized in alignment with the reforestation need as described in the National Forest System Reforestation Strategy and Draft National Nursery System Strategic Plan (see Attachments). This includes right-sizing existing and proposed sites by considering reforestation needs after timber harvest, wildfire, insect & disease outbreaks, and other natural disasters. Additional considerations include eliminating reforestation and facility deferred maintenance backlog, improving seed and seedling production rates, supporting a desired scale of production and seed caching, and providing improved operational workflow at each site (including addressing personnel needs, training, and recruitment). This evaluation includes closing current gaps in the system by cross-referencing the need with existing and proposed sites, capabilities for production and distribution, and type of seed/plant produced. Consideration shall be given to sharing equipment, resources, and personnel following critical events, such as megafires or other natural disasters. The contractor shall gain a thorough understanding of the process flows, facilities, and infrastructure at each of the existing sites. The PPAs and SDPs may need to be developed simultaneously or consecutively depending on the site. Additionally, PPAs and SDPs shall be prioritized considering the most appropriate method to meet future capacity demand for reforestation needs. SOWs and SDPs for the highest priority sites, as determined in conjuction with FS approval, �shall be started first before starting work on lower priority sites.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c726050aca6c43fea4786ae7ad5c03b2/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06657170-F 20230422/230420230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.