SOLICITATION NOTICE

Y -- SD FLAP CS23A(1) - DELTA-01 ACCESS ROAD

Notice Date
4/20/2023 2:11:58 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000020
 
Response Due
5/5/2023 1:00:00 PM
 
Point of Contact
KELLY PALMER, Phone: 7209633500
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE THIS IS FULL AND OPEN COMPETITION PROJECT NUMBER: SD FLAP CS23A(1) PROJECT NAME: DELTA-01 ACCESS ROAD PROJECT DESCRIPTION:� The Delta 01 site is located 0.6 miles north on CS-23A from exit 127 off of I-90.� Delta 01 is in Jackson County, South Dakota, about 17 miles from the Town of Wall. The access road to the Delta 01 missile site is CS-23A and owned and operated by Jackson County. The project will improve access to the Delta 01 Launch Control Facility. The existing gravel roadway will be widened to match the state-owned portion of the road and paved to provide a durable driving surface. Several existing culvert issues along the route will be addressed to reduce future maintenance costs for the County. SCOPE OF THE WORK:� �Proposed improvements to CS-23A include paving 0.51 miles of the county road and widening the existing travel way 17 feet wide, to 24 feet wide, providing two travel lanes 11 feet wide with new paved shoulders one foot wide. Improvements also will include installing Manual on Uniform Traffic Control Devices (MUTCD) compliant signing and striping. The proposed improvements will improve public access to the Delta 01 Launch Control Facility. Shoulder erosion was observed along the southeastern edge of the project. Embankment will be constructed to fill the erosion area and graded to provide positive drainage to the north. A culvert failed during spring 2019, necessitating an emergency backfill of the road by Jackson County. Three new larger culverts will be placed to provide improved drainage. The project�s assets are owned by Jackson County. The current roadway has several culverts full of sediment and have overtopped causing damage to the roadway. Placing new, appropriately sized culverts will decrease future maintenance issues.� Placing asphalt concrete pavement will decrease the annual maintenance necessary to grade and re-gravel this section of CS-23A. Recently, the National Park Service (NPS) built a paved parking lot and comfort station on the east side of CS-23A, across from the Delta 01 site. PRINCIPAL WORK ITEMS: 1,500 CUYD of Embankment Construction 3,150 Tons of Aggregate Base 2,000 Tons of Asphalt Concrete Pavement, Type 1 1,000 hours of Temporary Traffic Control, Flagger 0.6 miles of Ditch Reconditioning� 4 Concrete, Headwall for 36-Inch Pipe Culvert The estimated price range of the project work is between $700,000 and $2,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/4b1a63958cf64f10b99e3825975cb618/view)
 
Place of Performance
Address: Wall, SD, USA
Country: USA
 
Record
SN06657269-F 20230422/230420230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.