Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 22, 2023 SAM #7816
SOLICITATION NOTICE

49 -- C-17 - Test Set, Environmental Control System AI

Notice Date
4/20/2023 4:59:30 AM
 
Notice Type
Solicitation
 
NAICS
334419 — Other Electronic Component Manufacturing
 
Contracting Office
FA8526 AFLCMC WLMKA ROBINS AFB GA 31098-1670 USA
 
ZIP Code
31098-1670
 
Solicitation Number
FA8526-23-R-0003
 
Response Due
5/30/2023 2:00:00 PM
 
Archive Date
06/14/2023
 
Point of Contact
Joseph Kiefer, Philip Earthly
 
E-Mail Address
joseph.kiefer.3@us.af.mil, philip.earthly.1@us.af.mil
(joseph.kiefer.3@us.af.mil, philip.earthly.1@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The C-17 PMO has a firm fixed-price requirement for: Test Set, Environmental Control System AI,�Qty: 4 Ea, Option I: 3 Ea, Option II: 3 Ea, Option III: 3 Ea, NSN: 4920-01-611- 3303BA, First�Article/Production: 1 Ea/Production: 3 Ea, Test Plan: 1 LO, Test Report: 1 LO, IUID Marking Plan: 1�LO, P/N: 17G410645. The C-17 Aircraft utilizes an Integrated Environmental Control System (IECS) to� provide steady state heating, cooling, ventilation and cabin pressurization. As part of the IECS,�pneumatic valves are used to regulate flow within the system. Three of the valves utilized within�IECS are the high stage bleed air pressure regulator valve, PN: 3214936-2-1, pylon pressure�regulator bleed air valve, PN: 3214936-2-1, and the fan air valve, PN: 3224866-1-1. Maintainers have had�difficulty identifying the faulty component when trouble-shooting faults involving the High Stage�Regulator valve (HSV), Pylon Pressure Regulator/Pilot (PPRPV), Fan Air Valve (FAV), and the�associated pilot valve using existing Fault Isolation (FI) Procedures. A means is required at the�organizational and depot levels of maintenance to improve first-time fault isolation and reduce�NMC/MMH by isolating the valve pressure control and electrical circuits for troubleshooting. The�means is required to be used as an alternate to the current fault isolation procedure. The means�will require an external 115 vac/ 60hz electrical power source and an external 160 psi compressed�air source.. This is a 100% Small�Business Set-Aside.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a446753acc73464cac4e6a3f6d5011b9/view)
 
Record
SN06657642-F 20230422/230420230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.