Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 23, 2023 SAM #7817
MODIFICATION

Z -- SSCC Iberia Road Construction

Notice Date
4/21/2023 9:50:12 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH Washington DC 202501138 USA
 
ZIP Code
202501138
 
Solicitation Number
12363N23Q4063
 
Response Due
5/11/2023 3:00:00 PM
 
Archive Date
05/26/2023
 
Point of Contact
Karen Ruklic, Contract Specialist, Phone: 208-702-3519; contact via email is preferred, Fax: none, William Perry, Phone: 208-630-3954
 
E-Mail Address
karen.ruklic@usda.gov, william.perry@usda.gov
(karen.ruklic@usda.gov, william.perry@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Scope of Contract. �The Iberia Road Construction contract shall be awarded under the following authority: Stewardship Authority:� Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014�Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999.� The project area is located within the Middle Fork Weiser EIS area (NEPA) which is within the larger Weiser/Little Salmon Headwaters � Collaborative Forest Landscape Restoration Program Area.� Stewardship funds are being used to accomplish watershed restoration objectives while supporting the local economy. Description of Work: this project requires construction of one section of road, 0.27 miles in length, on the Council Ranger District of the Payette National Forest.� The work consists of 1) staking new road sections (slope, reference, and clearing/grubbing), 2) constructing road and 3) transporting/installing Government-furnished prefabricated bridge superstructure.� Payment will only be made for the items listed on the Schedule of Items; all other work is incidental. Contractor shall stake and construct the road in accordance with the plans and worklist to be provided with the solicitation.� Contractor shall construct MSE wall abutments with the use of welded wire wall materials, according to the plans, for the temporary bridge superstructure at the location provided in the worklist.� Hilfiker Retaining Walls Company shall supply materials for mechanically stabilized earth walls. Other manufacturers of welded wire faced MSE walls, may be accepted if approved equal.���� Contractor shall transport the 40 ft. temporary bridge superstructure from U.S. Forest Service Thorn Creek storage facility to the Iberia project location on National Forest System Road 50562. Contractor is to install temporary bridge superstructure according to the drawings. Contractor shall give COR 36 hrs. notice prior to bridge transport. All work shall be performed in compliance with the specifications, drawings and terms/conditions.� This includes furnishing all labor, equipment, supervision, transportation, operating supplies, and incidentals except those designated as Government Furnished to complete the work. Project Location: Council Ranger District.� From Council:� Drive South on Highway 95 (5 miles). Turn onto Middle Fork of the Weiser Road.� Drive about 15 miles to Forest Road 50206.� Turn right.� Drive about 0.5 miles.� Left hand side of road.� Orange flagging (if it made it through the winter). Middle Fork of Weiser Road is plowed approximately 7.5 miles from its junction with Highway 95.� Currently, it is possible to drive approximately 13 miles from the highway. From Donnelly:� Turn West onto E Roseberry Rd.� Turn right onto West Mountain road. Turn Left onto Road 50186 (Middle Fork of the Weiser Road).� In about 8.5 miles turn left onto 50206.� Drive about 0.5 miles.� Left hand side of road.� Orange flagging (if it made it through the winter). The Middle Fork of the Weiser Road (connects Donnelly to Council through Forest) is a groomed snowmobile route.� Because of this fact, access to the project site from Donnelly via passenger vehicle is currently limited. See Section J of the solicitation for project maps. Pre-Bid Tour.� No organized site visit is planned for this project; however, site imagery of the site of new road construction has been supplied.� Direct technical questions to project COR � Will Perry at the 208-634-0767 (office), 208-630-3954 (cell) or email william.perry@usda.gov.� Estimated price range per FAR 36.204(d): $25,000 and $100,000. All solicitation documents have been uploaded with this notice.� Quotes shall be submitted via email to karen.ruklic@usda.gov no later than May 11, 2023 at 3:00 PT.� Estimated start work date: June 1, 2023; all work shall be completed by August 15, 2023. �� Bonding: ��Alternative Payment Protection for 100% of the contract price shall be provided within 10 days of award so long as the awarded contract value is less than or equal to $150,000. Bid Bonds are required if the total value of the quote exceeds $150,000.� If the total value of the awarded contract exceeds $150,000, Payment and Performance Bonds shall be required. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/401408ec58224583afe024b822a1ee32/view)
 
Place of Performance
Address: Donnelly, ID 83615, USA
Zip Code: 83615
Country: USA
 
Record
SN06658582-F 20230423/230421230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.