Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 23, 2023 SAM #7817
SOLICITATION NOTICE

66 -- C-17 PSE - APU - Clamp Meter

Notice Date
4/21/2023 10:40:04 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
334515 — Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
 
Contracting Office
FA8526 AFLCMC WLMKA ROBINS AFB GA 31098-1670 USA
 
ZIP Code
31098-1670
 
Solicitation Number
FA852623Q0013
 
Response Due
5/19/2023 9:00:00 AM
 
Archive Date
06/03/2023
 
Point of Contact
Bobby Brett Mitchell, Philip Earthly, Phone: 4784722288
 
E-Mail Address
bobby.mitchell.8@us.af.mil, philip.earthly.1@us.af.mil
(bobby.mitchell.8@us.af.mil, philip.earthly.1@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The C-17 program management office has a requirement for a firm-fixed price contract for one (1) each NSN: 6625-01-547-4345, APU-CLAMP METER, P/N 17G245521-1, which includes one first article/production item, one first article test plan, one marking plan, and one first article test report. � The C-17 aircraft contains an auxiliary power unit (APU) that provides electrical power and pneumatic power to the aircraft when the engines are not running. These powers are used for the lighting, avionics, avionics cooling, and starting engines. The APU is a small turbine engine in the forward portion of the right wheel well pod. The APU requires constant air flow to operate. The APU inlet door allows air to flow to the APU. The inlet door needs to remain opened when the APU is running because the APU consumes a large volume of air. �The APU inlet door is controlled by a rotary electro-mechanical actuator. When the inlet door is properly rigged, the rotary actuator normally would shut off at fully open or fully closed position. When the inlet door is not properly rigged, the actuator would not be shut off at fully open or fully close position and keep drawing current. In such event, it can cause the actuator to overheat and fail. When the actuator fails, the door could be sucked closed causing very low pressure inside the APU inlet ducting. This would cause an APU implosion event. A means is required to test the current to the actuator to ensure the actuator is rigged properly at the organizational and depot level of maintenance. This measuring device shall meet the following requirements: 1. Shall be able to measure without opening any electrical connectors. 2. Shall be able to measure dc current from 0 to 1 amp. 3. Shall have accuracy and resolution to show current is less than 0.1a when door is fully closed or fully open. 4. Shall be able to fit around a 0.5� bundle of wiring. 5. Shall be portable and easy to use. 6. Shall be intrinsically safe or contain proper warning lab Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFQ. This is a 100% Small Business Set Aside. �All responsible small business sources may submit a proposal to be considered by the contracting agency. The Government will utilize the past performance information retrieval system (PPIRS), excluded parties list system (EPLS), and other Government databases to determine contractor status before evaluating proposals. Proposals will be evaluated based on the criteria stated in the RFQ. All data for this weapon system is considered EXPORT CONTROLLED.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/30a539e86a9e4004b48c6125faf5bd71/view)
 
Record
SN06659133-F 20230423/230421230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.