SOLICITATION NOTICE
20 -- USCGC MUNRO REPLACE FAN COIL UNITS
- Notice Date
- 5/2/2023 12:35:54 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
- ZIP Code
- 94501
- Solicitation Number
- 70Z08523PR0019580
- Response Due
- 5/17/2023 8:00:00 AM
- Archive Date
- 06/01/2023
- Point of Contact
- KYLER FISK, Phone: 9492881271, Tyler Melton, Phone: 5104375437
- E-Mail Address
-
KYLER.C.FISK@USCG.MIL, Tyler.k.melton@uscg.mil
(KYLER.C.FISK@USCG.MIL, Tyler.k.melton@uscg.mil)
- Description
- 20S23_NN_51400_JSP_0423_755 S_51400_ESD_0322_SWIT ITEM 1: Fan Coil Units, Renew 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew the fan coil unit identified in Table 1. Table 1 - Fan Coil Units coil / system number COIL SIZE / TYPE Location Drawing 2-63-2 / RS 9 68 / DW 2-60-4-Q 750-WMSL-512-007 (Item 2) 01-37-2 / RS 4 66 / DW 01-40-2-Q 750-WMSL-512-006 (Item 4) 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y Cooling Coil, 68 DW, MIL-C-2939F (CID# 4130-DAO-739624) Item 2 of Drawing 750-WMSL-512-007 1 ea. Y Cooling Coil, 66 DW, MIL-C-2939F (CID# 4130-DAO-739622) Item 4 Drawing 750-WMSL-512-006 1 ea. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-180-024, Rev F, FDN ARR DWG Design Unit 2330 BKLT NO. 1 (ASC180233) (UNSIGNED) Coast Guard Drawing 750-WMSL-180-038, Rev D, FDN ARR DWG Design Unit 4210 BKLT NO. 1 (ASC180421) (UNSIGNED) Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule AND L/M (ASC508001) (UNSIGNED) Coast Guard Drawing 750-WMSL-512-534, Rev C, HVAC Equipment List Coast Guard Drawing 750-WMSL-512-007, Rev B, VENT & AIR COND FAN RM (P) 2ND DK UNIT 2330 (ASC512012) (UNSIGNED) Coast Guard Drawing 750-WMSL-512-006, Rev D, VENT & AIR COND FAN RM (P) 01 LVL UNIT 4210 (ASC512009) (UNSIGNED) Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002) (UNSIGNED) Coast Guard Drawing 750-WMSL-516-013, Rev D, Chilled Water Unit 2330 Coast Guard Drawing 750-WMSL-516-022, Rev B, Chilled Water Unit 4210 Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References Code of Federal Regulations (CFR) Title 29, Part 1915, Subpart E, Sep 2015, Scaffolds, Ladders and Other Working Surfaces 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures.� The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). 3.1.5 Scaffolding and rigging.� The Contractor must, in accordance with CFR Title 29, Part 1915, Subpart E, erect suitable staging or scaffolding, as required, to facilitate work.� The Contractor is responsible to provide rigging and providing crane services to install GFP Equipment.� 3.1.6 Rigging plan.� The Contractor must provide rigging plan for GFE equipment at the Arrival Conference for government approval. 3.1.7 Electrical work. �The Contractor must accomplish all electrical work in accordance with SFLC Std Spec 3042, and test cables in accordance with SFLC Std Spec 3041� 3.1.8 Welding requirements.� The Contractor must accomplish all welding in accordance with SFLC Std Spec 0740. 3.1.9 NDI.� The Contractor must perform NDI of the welds in accordance with SFLC Std Spec 0740, Appendix C.� Submit a CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.1.10 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.2 Fan coil renewal. The Contractor must perform the following to renew the fan coil units identified in Table 1. 3.2.1 Drain. Isolate, drain and dispose of all fluids from each fan coil unit's supply and return piping system in accordance with applicable Federal, state and local regulations. 3.2.2 Removal. Disconnect and remove each fan coil unit, disposing of material in accordance with all applicable Federal, state, and local regulations. 3.2.3 Installation. Install new GFE fan coil units to original configuration with new fasteners using following Coast Guard Drawings as guidance: Coast Guard Drawing 750-WMSL-180-024 Coast Guard Drawing 750-WMSL-180-038 Coast Guard Drawing 750-WMSL-512-534 Coast Guard Drawing 750-WMSL-512-006 Coast Guard Drawing 750-WMSL-512-007 Coast Guard Drawing 750-WMSL-516-002, Coast Guard Drawing 750-WMSL-516-013 Coast Guard Drawing 750-WMSL-516-022 3.2.4 Thermostats. Reconnect all fan controls and thermostat wiring. 3.3 Surface preparation. The Contractor must clean all exposed piping with a soft bristle brush and a mild detergent solution to remove all visible surface contaminants. WARNING Do not drain any fluids including fresh water, into any space, bilge, or exterior location. 3.4 Pipe flushing. After all authorized work is completed; flush all new and disturbed piping with clean fresh water for five minutes or until all debris is removed, whichever occurs first. Ensure that flushing fluid is directed to move scale and foreign debris away from installed machinery to prevent possible damage upon operational testing. Submit a CFR documenting date and time of flushing process, and verification of piping cleanliness. 3.4.1 Disposal. Dispose of flushing fluid in accordance with all applicable federal, state, and local regulations. 3.5 Insulation renewal. The Contractor must renew all insulation material disturbed during accomplishment of this Work Item over all piping, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in Coast Guard Drawing 750-WMSL-508-001. �Do not attempt to re-use existing insulation.� 3.5.1 Coating. Coat the newly installed insulation using the system specified for �Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam� in SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems). 3.6 Leak test. After assembling all mechanical (i.e., threaded, bolted, etc.) joints, the Contractor must test the Fan Coil Units and associated piping system's operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.7 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR. 3.8 Water or air testing. The Contractor must perform a water test or air test to verify all drain lines are clear. 3.9 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs). 4.� NOTES This section is not applicable to this work item.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/354a386f5408453aa2d06e6546dd0bbf/view)
- Place of Performance
- Address: Alameda, CA 94501, USA
- Zip Code: 94501
- Country: USA
- Zip Code: 94501
- Record
- SN06668911-F 20230504/230502230115 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |