Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 25, 2023 SAM #7849
SOLICITATION NOTICE

Z -- USACE SPK DB Construction ? East 388th Apron Repair, Hill AFB, UT.

Notice Date
5/23/2023 1:58:34 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123823R0030
 
Response Due
5/30/2023 9:00:00 AM
 
Archive Date
05/22/2024
 
Point of Contact
Heidi May, Phone: 8015863072, Amelia Bryant, Phone: 8178432738
 
E-Mail Address
heidi.e.may@usace.army.mil, Amelia.K.Bryant@usace.army.mil
(heidi.e.may@usace.army.mil, Amelia.K.Bryant@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
USACE SPK 2 Phase DB Construction ? East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the addition of an aggregate base course with stabilized drainage layer and geotextile filter fabric, as required for seasonal frost conditions. Replace existing shoulder asphalt pavement, along with rework of the shoulder base course, provide anchored tie-downs and pavement markings on the new pavements, removal of underground asbestos piping, and installation and/or removal of crew shacks. Demolition includes removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. 0002 -The purpose of this amendment is to: 1. From : NAICS code 238110 - Poured Concrete Foundation and Structure Contractors To NAICS 237310 - Highway, Street, and Bridge Construction 2. Update FAR Clause 52.204-8 Annual Representations and Certifications. 0003 -The purpose of this amendment is to1. Change Section 00 22 00, Phase One Evaluation Factors, paragraph C. FACTORS TO BE EVALUATED, Tab 2 of the Technical Proposal:Factor 1 - Past Performance, paragraph viii - Formatting and other restrictions:From Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 12PDF pages total, for all projectsTo Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 24 PDF pages total, for all projects.2. Change the number of example project an offeror may submit under tab 2 from three (3) to six (6)
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fbbb2d0dbb4c46c498e95c94da779124/view)
 
Record
SN06691701-F 20230525/230523230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.