Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 04, 2023 SAM #7859
SOLICITATION NOTICE

Y -- Water Tank Rehabilitation Shenango Lake, Mercer County, Pennsylvania

Notice Date
6/2/2023 11:30:32 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN23B8012
 
Response Due
6/13/2023 8:00:00 AM
 
Archive Date
09/30/2023
 
Point of Contact
Connie Ferguson, Phone: 412-395-7551, Magdalena Bernard, Phone: 4123957504
 
E-Mail Address
connie.l.ferguson@usace.army.mil, magdalena.bernard@usace.army.mil
(connie.l.ferguson@usace.army.mil, magdalena.bernard@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Water Tank Rehabilitation Shenango Lake, Mercer County, PennsylvaniaThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the elevated water tank at Shenango Lake, Mercer County, Pennsylvania. The contract generally includes the removal and replacement of interior piping and related appurtenances, removal and replacement of interior 6-inch concrete slab and removable grating, removal and replacement of electric panels, and removal and replacement of interior lower ladder. The major features of the requirements are identified below.The contract specifically includes:A. The removal, disposal, and ?in-kind? replacement of all interior pedestal and tank piping and valves including the risers, overflow, and drain lines along with all heat tracing, insulation, supports, and associated appurtenances.B. The removal, disposal, and replacement of the interior 6-in concrete slab to allow for the replacement of any embedded piping. This includes all fill, steel reinforcement, expansion materials, and appurtenances associated with any penetrations through the concrete slab.C. The removal, disposal, and ?in-kind? replacement of the removable grating and its associated angles.D. The removal, disposal, and replacement of the interior electrical panels including Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical panels shall functionally duplicate the existing panels.E. The removal and disposal of the existing access ladder from the ground level through the insulated ceiling to the first work platform and the replacement with an OSHA approved ladder and safety climbing devices, consisting of flexible cable type system with full body harness.Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 09, 2023) through Labor Day (September 05, 2023). All shutdowns are to be coordinated with the Contracting Officer or designated representative.The work shall be completed within 365 calendar days after written Notice to Proceed. Per FAR 36.204(d) the magnitude of construction is between $250,000 and $500,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c95bad19ca334eff94cbda41bb0d5055/view)
 
Record
SN06702708-F 20230604/230602230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.