SOLICITATION NOTICE
Y -- Water Tank Rehabilitation Shenango Lake, Mercer County, Pennsylvania
- Notice Date
- 6/2/2023 9:41:10 AM
- Notice Type
- Solicitation
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN23B8012
- Response Due
- 6/13/2023 8:00:00 AM
- Archive Date
- 09/30/2023
- Point of Contact
- Connie Ferguson, Phone: 412-395-7551, Magdalena Bernard, Phone: 4123957504
- E-Mail Address
-
connie.l.ferguson@usace.army.mil, magdalena.bernard@usace.army.mil
(connie.l.ferguson@usace.army.mil, magdalena.bernard@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- Water Tank Rehabilitation Shenango Lake, Mercer County, PennsylvaniaThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the elevated water tank at Shenango Lake, Mercer County, Pennsylvania. The contract generally includes the removal and replacement of interior piping and related appurtenances, removal and replacement of interior 6-inch concrete slab and removable grating, removal and replacement of electric panels, and removal and replacement of interior lower ladder. The major features of the requirements are identified below.The contract specifically includes:A. The removal, disposal, and ?in-kind? replacement of all interior pedestal and tank piping and valves including the risers, overflow, and drain lines along with all heat tracing, insulation, supports, and associated appurtenances.B. The removal, disposal, and replacement of the interior 6-in concrete slab to allow for the replacement of any embedded piping. This includes all fill, steel reinforcement, expansion materials, and appurtenances associated with any penetrations through the concrete slab.C. The removal, disposal, and ?in-kind? replacement of the removable grating and its associated angles.D. The removal, disposal, and replacement of the interior electrical panels including Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical panels shall functionally duplicate the existing panels.E. The removal and disposal of the existing access ladder from the ground level through the insulated ceiling to the first work platform and the replacement with an OSHA approved ladder and safety climbing devices, consisting of flexible cable type system with full body harness.Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 09, 2023) through Labor Day (September 05, 2023). All shutdowns are to be coordinated with the Contracting Officer or designated representative.The work shall be completed within 365 calendar days after written Notice to Proceed. Per FAR 36.204(d) the magnitude of construction is between $250,000 and $500,000.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/a7c27f541b874098939c0fc0e1222b32/view)
- Record
- SN06702717-F 20230604/230602230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |