SOLICITATION NOTICE

Y -- Maintenance Dredging of East River, South Brother Island Channel, New York, Federal Navigation Project.

Notice Date
6/2/2023 6:40:08 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS23B0005
 
Response Due
6/29/2023 11:00:00 AM
 
Archive Date
07/14/2023
 
Point of Contact
Orlando Nieves, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
orlando.nieves@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil
(orlando.nieves@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of East River, South Brother Island Channel, New York, Federal Navigation Project to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable over-depth. The proposed maintenance dredging would remove approximately 425,000 cubic yards (CY) of critical shoals from the East River South Brother Island Channel with subsequent placement at the Historic Area Remediation Site (HARS). The dredged material from South Brother Island Channel is expected to consist of 0% gravel, 13.9% sand, 63.9% silt, and 22.2% clay. Due to restrictions in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple scows and tugboats will be needed to perform the work during the dredging, and placement operations. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of material. The presence of dredging equipment in the channel will impact vessel traffic and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place in the fall/winter of 2023. The work is estimated to cost between than $5,000,000 and $10,000,000.00. This is an unrestricted procurement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/537ef3d363384f558667d0148c15b3e6/view)
 
Place of Performance
Address: New York, NY, USA
Country: USA
 
Record
SN06702736-F 20230604/230602230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.