Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 16, 2023 SAM #7871
SOLICITATION NOTICE

Z -- VGLZ 162323: ADAL Fuel Cell & Corrosion Control, Bldg. 154

Notice Date
6/14/2023 9:17:15 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W7NF USPFO ACTIVITY MIANG 127 SELFRIDGE ANGB MI 48045-5213 USA
 
ZIP Code
48045-5213
 
Solicitation Number
W50S8523B0004
 
Response Due
6/20/2023 8:00:00 AM
 
Archive Date
09/30/2023
 
Point of Contact
Steven Stocking, Phone: 5862394881, Anna Randall, Phone: 5862395526
 
E-Mail Address
steven.stocking.2@us.af.mil, anna.randall.1@us.af.mil
(steven.stocking.2@us.af.mil, anna.randall.1@us.af.mil)
 
Description
14 June 2023: 1.� Updated RFI and representational drawing added to this posting. 8 June 2023: 1. RFI Document is added to this posting. 2.� Amendment 3 is issued.� Amendment 3 incorporates Addendum 1 into the terms and conditions of this Invitation for Bids.� All interested bidders are strongly advised to acknowledge this amdnement as failure to acknowledge will most likely lead to a� non responsive determination.� Non responsive offers shall not be� considered for award.� 5 June 2023: Amendment 2.� Bid due date is now 20 June 2023.� The time bids are due remains the same at 11:00 AM EDT 5 May 2023:� Pre bid Site Vist Minutes and Sign in Sheet Posted� 29 April 23: Amendment 1.� The site visit has changed to�Thursday, May 4, 2023 9:00 AM This project will provide a renovation to the facility, with small additions to the office area to provide enhanced support areas/offices. The administration and support areas, including office spaces, break room, toilet and locker rooms, workshops, and utility rooms are reconfigured with full-height, nonload bearing CMU partitions separating the shop spaces and support areas. Full height wall tile shall be applied to the toilet/locker/shower rooms. Remaining walls will have paint or epoxy finishes. Flooring will include carpetedoffices, rubber tiles in the break area, tile floors in the toilet and locker rooms, and epoxy in the corridors and shop spaces. Existing storefront openings, entries, and windows are to be replaced. The additions will match the existing building and consist of insulated metal panel above a concrete masonry and brick wall base. The hangar bay work will be completed in two phases. The first phase will renovate the east bay while maintaining operability of the west bay, with the second phase renovating the west bay after the east bay is operational. The hangar floor will require a new epoxy floor system. New door fabric and electrical service and controls upgrades for the hangar doors are included to allow for door operation by emergency generator as well as fire department operation by key on the outside of the building. New fall protection systems will be provided over the aircraft locations in each bay. The exterior work for this project will include the demolition of the existing concrete containment area, Jet Fuel JP-8 equipment, landscape, asphalt and concrete pavement, and Utilities, including sanitary sewer, water main, storm sewer, and electrical equipment. This project will include the construction of two additions totaling 1,325-sf and the reconfiguration ofthe existing 17,650-sf Fuel Cell/Corrosion Control Facility. Proposed site improvements includemodifications to the existing parking lot to support the east addition. Utility improvement to include relocated sanitary sewer lines, relocated storm sewer mains, and a new fire protectionwater main line. A new oil-water separator will replace the existing system located near the northeast corner of the existing system.A new 54 ft. tall/300,000-gallon prefabricated steel water storage tank and a pumping station willbe built to supply water for fire suppression to future renovated and constructed Hangars 3, 4,and 5 and Building 154. The new pumping station will provide a new 10 inch water distributionloop to the new water-based fire suppression systems and fire sprinkler systems in each of theHangars H154, H3, H4 and H5. A stub connection will be provided in at each hangar for future connection to the fire pump-loop system improvements. These utility improvements will require removal and replacement of asphaltic and concrete pavement, along with curb and gutter replacement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8ff0e2de65bc4e1eaf45bc29313178ec/view)
 
Place of Performance
Address: Selfridge ANGB, MI 48045, USA
Zip Code: 48045
Country: USA
 
Record
SN06715773-F 20230616/230614230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.