Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 22, 2023 SAM #7877
SOLICITATION NOTICE

Y -- Gallery Flooding Mitigation at Braddock Locks and Dam

Notice Date
6/20/2023 12:08:37 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
 
ZIP Code
15222-4198
 
Solicitation Number
W911WN23B8017
 
Response Due
6/20/2023 10:00:00 AM
 
Archive Date
06/08/2024
 
Point of Contact
ERICA MULLEN, Phone: 4123957256, JOSHUA KAUFMANN, Phone: 412-395-7508
 
E-Mail Address
erica.l.mullen@usace.army.mil, joshua.p.kaufmann@usace.army.mil
(erica.l.mullen@usace.army.mil, joshua.p.kaufmann@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
The US Army Corps of Engineers, Pittsburgh District, has a requirement for construction of pumping systems capable of preventing flooding of galleries at Monongahela River Locks and Dam 2 (Braddock Locks and Dam), under normal upstream pool levels. The pumping systems consist of three Government-furnished pump stations and piping. The major features of work are 1) Mechanical, Electrical and Structural Demolition and Disposal (a) Removal of abandoned hydraulic piping and valves and disposal of oil. Removal of unused electrical and existing ladder wrungs. 2) Concrete Work consisting of fill of hydraulic pit for pump station install (a) Removal of section of jib crane pad on landwall. 3) Delivery of Government-furnished equipment to Braddock Locks and Dam (a) Three self-priming pump stations, enclosure, controls and spares. 4) Installation and modification of miscellaneous existing features (a) Metal screening over wet wells and modification of hatch covers and lower approach grating. 5) Installation of pump suction and discharge piping, appurtances, electrical and all controls. Typical pool elevations at Monongahela Locks and Dam 2, where work will be performed, are 718.7 upstream and 710.2 downstream (all elevations are based on the NGVD 88 datum). Debris and rubbish shall be disposed of at a properly permitted facility licensed to accept waste or recyclable materials, as applicable. Construction work will occur in close proximity to waterway traffic. The anticipated work schedule is to be 270 days from notice to proceed. The IFB Package contains the solicitation and four (4) Attachments. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9ce418e7b5ca43ea8932a84a4c57fd6e/view)
 
Record
SN06720466-F 20230622/230620230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.