SOURCES SOUGHT
C -- C-130J Foreign Military Sales (FMS) Automatic Dependent Surveillance-Broadcast (ADS-B) Out
- Notice Date
- 6/21/2023 12:23:27 PM
- Notice Type
- Sources Sought
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- FA8553 AFLCMC WLNKB ROBINS AFB GA 31098-1670 USA
- ZIP Code
- 31098-1670
- Solicitation Number
- FA8553-23-ADSBOUT
- Response Due
- 7/14/2023 12:30:00 PM
- Archive Date
- 07/29/2023
- Point of Contact
- Claudette MacNeil, Leon Castellano
- E-Mail Address
-
claudette.macneil@us.af.mil, leon.castellano@us.af.mil
(claudette.macneil@us.af.mil, leon.castellano@us.af.mil)
- Description
- The Government is conducting Market Research to identify potential vendors that possess the capability to develop, install, test, and qualify an Automatic Dependent Surveillance-Broadcast out (ADS-B) solution for a C-130J-30 aircraft with a Block 6.0 configuration. The scope of the effort will require a contractor to design, procure, and install the ADS-B out modification to the partner nation C-130J-30 fleet of six (6) aircraft. The development and production efforts will include a full complement of training and logistic activities to ensure implementation of an efficient sustainment program.� The effort includes the accomplishment of airworthiness (AW) requirements in accordance with AWB-345, AFI 62-601, and all applicable United States Air Force (USAF) AW policy. The ADS-B out solution shall be compliant with DOD AIMS 17-1000 and proposed equipment shall be compliant with FAA TSO-CI45c/TSO-C-146d and TSO-C-190. The solution will require delivery of a Tech Data Package (TDP) to include drawings, technical orders, and airworthiness documentation. The current partner nation C-130J-30 configuration contains an existing Raytheon APX-119 Identification Friend or Foe (IFF) transponder that does not have ADS-B out capability and a dual Honeywell Embedded Global positioning system / Inertial navigation system (EGI) that is not a sufficient source of aircraft position, altitude, and velocity information for ADS-B out compliance. The solution will require mission computer software changes. Contractor shall furnish all material, support equipment, tools, test equipment, and services. The contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor�s facility. Contractor furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. For further information and instructions, please see the attachment titled ""FA8553-23-ADSBOUT RFI"". **Updated 21 June 2023 in order to remove the 3-page limitation for submission originally included on page 4 of the attachment.**
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/deee4fd638c44e038f0ac09798db3b48/view)
- Record
- SN06723407-F 20230623/230621230122 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |