SOLICITATION NOTICE
J -- NOTICE OF INTENT TO SOLE SOURCE - SHIMADZU SONIAL VISION G4 MAINTENANCE SERVICES
- Notice Date
- 6/27/2023 1:27:17 PM
- Notice Type
- Presolicitation
- NAICS
- 811210
—
- Contracting Office
- 261-NETWORK CONTRACT OFFICE 21 (36C261) MATHER CA 95655 USA
- ZIP Code
- 95655
- Solicitation Number
- 36C26123Q0880
- Response Due
- 6/30/2023 12:00:00 PM
- Archive Date
- 07/15/2023
- Point of Contact
- Regina Spillane, Contract Specialist, Phone: (925) 372-2386
- E-Mail Address
-
regina.spillane1@va.gov
(regina.spillane1@va.gov)
- Awardee
- null
- Description
- PERFORMANCE WORK STATEMENT 1. EQUIPMENT IDENTIFICATION: MANUFACTURER Shimadzu _____ MODEL - Sonal Vision G4 _____ SN - ___41C3518B8001__ EE - ____356210_____________ LOCATION - San Francisco VAMC, Radiology Dept., 2A158-200 MANUFACTURER Shimadzu _____ MODEL - DR-300 Workstation _____ SN - ___ LMDEAE4B8012__ EE - ____356211_____________ LOCATION - San Francisco VAMC, Radiology Dept., 2A158-200 2. DEFINITIONS/ACRONYMS: A. Biomedical Engineer(ing) - Supervisor or designee. B. CO - Contracting Officer C. COTR - Contracting Officer's Technical Representative D. PM - Preventive Maintenance Inspection. Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. E. FSE - Field Service Engineer. A person who is authorized by the contractor to perform maintenance (corrective and/or preventive) services on the VAMC premises. F. ESR - Vendor Engineering Service Report. A documentation of the services rendered for each incidence of work performance under the terms and conditions of the contract. G. Acceptance Signature - VA employee who is authorized to sign-off on the ESR which indicates that the PM has been concluded or is still pending completion H. Authorization Signature - COTR signature; indicates COTR accepts work status as stated in ESR. I. NFPA - National Fire Protection Association. J. CDRH - Center for Devices and Radiological Health. K. VAMC - Department of Veterans Affairs Medical Center L. VAH - Department of Veterans Affairs Hospital 3. CONFORMANCE STANDARDS: Contract service shall ensure that the equipment functions in conformance with the latest published edition of NFPA-99, UL, VA, and CDRH. 4. OPERATIONAL UPTIME - REQUIREMENTS: The SHIMADZU SONAL VISION G4 shall be operable and available for use during the normal operating hours of the equipment as detailed in paragraph V., HOURS OF COVERAGE. 5. HOURS OF COVERAGE: A. Normal hours of coverage are 24 hours a day, 7 days per week. All service will be performed during normal hours of coverage unless requested or approved by COR or designee. B. Preventive maintenance will be performed in accordance with manufacturer s recommendations. Preventive maintenance will be performed during normal hours of coverage or as agreed to by user and COR or designee. C. Work performed outside the normal hours of coverage at the request of COR or designee will be billed at the price set by the vendor. Billing will include service time plus one (1) hour for travel time, and exclude parts, as they are included in the Vendor Contract. Work performed outside the normal hours of coverage at the request of FSE will be considered service during normal hours of coverage. NOTE: Hardware/software update/upgrade installations will be scheduled and performed outside normal hours of coverage at no additional charge to the Government (unless it would be detrimental to equipment up-time; to be determined by COR or designee). Government provides software/hardware upgrade/update. D. Federal Holidays observed by the VAMC are: New Years' Day Martin Luther King Day Presidents' Day Memorial Day Independence Day Juneteenth Labor Day Columbus Day Veterans' Day Thanksgiving Day Christmas Day 6. SCHEDULED MAINTENANCE: A. The Contractor shall perform PM Service to ensure that equipment listed in the schedule performs in accordance with Section 3, Conformance Standards. (An outline of the PM procedures and schedule shall be provided to COR or designee). The Contractor shall provide and utilize procedures and checklists with worksheet originals indicating work performed and actual values obtained (as applicable). This documentation shall be provided to the Lead Biomedical Equipment Support Specialist at the completion of the PM (preferably in electronic format). The contractor shall provide written description of Preventive Maintenance Inspections (PMI). This description shall include an itemized list of the procedures performed, including electrical safety. PM services shall include, but need not be limited to, the following: 1) Cleaning of equipment. 2) Reviewing operating system software diagnostics to ensure that the system is operating in accordance with Section 3, Conformance Standards or the manufacturer's specifications. 3) Calibrating and lubricating the equipment. 4) Performing remedial maintenance of non-emergent nature. 5) Testing and replacing faulty and worn parts and/or parts likely to become faulty, fail or become worn. 6) Inspecting and replacing where indicated, electrical wiring and cables for wear and fraying. 7) Inspecting, and replacing where indicated, all mechanical components which may include, but is not limited to: X-ray tube mounting hardware, patient restraints and support devices, cables and mounting hardware, chains, belts, bearings and tracks, interlocks, clutches, motors, keyboards, and patient couches for mechanical integrity, safety, and performance. 8) Returning the equipment to the operating condition [defined in Section 3, Conformance Standards]. 9) Providing documentation of services performed. 10) Inspecting and calibrating the hard copy image device. B. PM Services shall be performed in accordance with, and during the hours defined in, the preventive maintenance schedule established herein. All exceptions to the PM schedule shall be arranged and approved in advance with COR or designee. C. Any charges for parts, services, manuals, tools, or software required to successfully complete scheduled PM are included within this contract, and its agreed upon price, unless specifically stated in writing otherwise. 7. PARTS: The Contractor shall furnish and replace parts to meet uptime requirements. The Contractor has ready access to all Original Equipment Manufacture parts, including unique and/or high mortality replacement parts. All parts supplied shall be from the Original Equipment Manufacturer. The contract shall include all parts. All parts shall be of current manufacture and have complete versatility with the presently installed equipment. All parts shall perform identically to the original equipment specifications. 8. SERVICE MANUALS/TOOLS/EQUIPMENT: The VAMC shall not provide tools, (test) equipment, service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSE's all operational and technical documentation (such as operational and service manuals, schematics, and parts list) which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name and/or the manuals themselves shall be provided to the CO upon request. 9. DOCUMENTATION/REPORTS: The documentation shall include detailed descriptions of the scheduled and unscheduled maintenance procedures performed, including replaced parts and prices (for outside normal working hour services) required to maintain the equipment in accordance with Section 3, Conformance Standards or the manufacturer's specifications. Such documentation shall meet the guidelines as set forth in the Conformance Standards section. The ESR will consist of a separate PM report for the item(s) covered under the ""specific"" contract. Grouping different equipment from different contracts on ""one"" ESR is prohibited. In addition, each ESR must, at a minimum, document the following data legibly and in complete detail: A. Name of contractor and contract number. B. Name of FSE who performed services. C. Contractor service ESR number/log number. D. Date, time (starting and ending), equipment downtime and hours on-site for service call. E. VA purchase order number(s) covering the call if outside normal working hours. F. Description of problem reported by COR or designee/user (if applicable). G. Identification of equipment to be serviced: 1) Inventory ID number, 2) Manufacturer's name, 3) Device name, 4) Model number, 5) Serial number, 6) Any other manufacturer's identification numbers. H. Itemized Description of Service Performed (including, if applicable, Costs associated with after normal working hour services) including: 1) Labor and Travel, 2) Parts (with part numbers), 3) Materials and Circuit Location of problem/corrective action. I. Total Cost to be billed (if applicable - i.e., part(s) not covered or service rendered after normal hours of coverage). J. Signatures: 1) FSE performing services described. 2) Authorized VA Employee who witnessed service described. NOTE: Any additional charges claimed must be approved by COR or designee before service is completed! 10. REPORTING REQUIREMENTS: The Contractor shall be required to report to Biomedical Engineering to log in. This check in is mandatory. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to log out with Biomedical Engineering and submit the ESR(s) to COR or designee. ALL ESRs shall be submitted to the equipment user for an ""acceptance signature"" and to COR or designee for an ""authorization signature"". If COR or designee is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR). VA Biomedical Contact Person(s): Lead Biomedical Equipment Support Specialist___ Telephone Number & Extension(s): 415-221-4810 ext 25122____________________ Location: Building 6, Room 11, Biomedical Engineering Shop____________________ PAYMENT: Invoices will be paid in arrears on a monthly basis. Invoices, MUST INCLUDE, at a minimum, the following information: Contract No., Purchase Order No., Item(s) covered (to include serial #'s) by the PMI and covered period of service. Each invoice must be provided in triplicate. 12. ADDITIONAL CHARGES: There will be no additional charge for time spent at the site (during, or after the normal hours of coverage) awaiting the arrival of additional FSE and/or delivery of parts. 13. REPORTING REQUIRED SERVICES BEYOND THE CONTRACT SCOPE: The Contractor shall immediately, but no later than 24 (twenty-four) consecutive hours after discovery, notify the CO and COR (in writing) of the existence or the development of any defects in, or repairs required, to the scheduled equipment which the Contractor considers he/she is not responsible for under the terms of the contract. The Contractor shall furnish the CO and COR or designee with a written estimate of the cost to make necessary repairs. 14. CONDITION OF EQUIPMENT: The Contractor accepts responsibility for the equipment described in Section C, paragraph I., in ""as is"" condition. Failure to inspect the equipment prior to contract award will not relieve the Contractor from performance of the requirements of this contract. 15. COMPETENCY OF PERSONNEL SERVICING EQUIPMENT: A. Each respondent must have an established business, with an office and full time staff. The staff includes a ""fully qualified"" FSE and a ""fully qualified"" FSE who will serve as the backup. B. ""Fully Qualified"" is based upon training and on experience in the field. For training, the FSE(s) has successfully completed a formalized training program, for the equipment identified in the Section B schedule. For field experience, the FSE(s) has a minimum of two years of experience (except for equipment newly on the market) with respect to scheduled and unscheduled preventive and remedial maintenance. C. The FSE's shall be authorized by the Original Equipment Manufacturer (OEM) and the Contractor to perform the maintenance services. All work shall be performed by ""Fully Qualified"" competent FSE s. The Contractor shall provide written assurance of the competency of their personnel and a list of credentials of approved FSE s for each make and models the Contractor services at the VAMC. The CO may authenticate the training requirements, request training certificates or credentials from the Contractor at any time for any personnel who are servicing or installing any VAMC equipment. The CO and/or COR specifically reserve the right to reject any of the Contractor's personnel and refuse them permission to work on the VAMC equipment. D. If subcontractor(s) are used, they must be approved by the CO; the Contractor shall submit any proposed change in subcontractor(s) to the CO for approval/disapproval. 16. TEST EQUIPMENT: Prior to commencement of work on this contract, the Contractor shall provide the VAMC with a copy of the current calibration certification of all test equipment which is to be used by the Contractor on VAMC's equipment. This certification shall also be provided on a periodic basis when requested by the VAMC. Test equipment calibration shall be traceable to a national standard. 17. REMOTE SUPPORT: The contractor shall have proper access and control to remotely monitor all equipment as required in Section 5. This includes background checks and Information Security Officer approval as required by Directive 6500. The contractor must demonstrate active security clearance before award. The VAMC is responsible for maintaining and providing a high speed internet access and firewall modification to enable connectivity. 18. MOBILE MEDIA SCANNING: The Contractor will identify if removable media (i.e. USB or DVD/CD Device) is required to perform his/her duties. COR or designee will ensure the removable media is scanned with anti-virus software running current virus definitions prior to connection to any medical device system. The computer system for scanning removable media is located in the biomedical engineering shop, Building 6, Room 11. 19. IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS: The Contractor's FSE s shall wear visible identification at all times while on the premises of the VAMC. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court. 20. INSURANCE: A. Worker compensation and employer's liability: - Contractors are required to comply with applicable Federal and State Worker Compensation and occupational disease statutes. B. General Liability: - Contractors are required to have Bodily Injury Liability Insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence. C. Property Damage Liability: - Contractors are required to have Property Damage Liability insurance coverage of at least $500,000.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/2bfe4af40adc4aa2b5c95d99c813cf8a/view)
- Place of Performance
- Address: San Francisco VA Health Care Systems 4150 Clement Street, San Francisco 94121
- Zip Code: 94121
- Zip Code: 94121
- Record
- SN06729148-F 20230629/230627230042 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |