Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 29, 2023 SAM #7884
SOLICITATION NOTICE

J -- USCGC WAESCHE FOLDING BOOM CRANE RENTAL

Notice Date
6/27/2023 11:44:52 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08523P20808
 
Response Due
7/11/2022 5:00:00 AM
 
Archive Date
07/26/2022
 
Point of Contact
RODERIOUS HARMON, Phone: 5104375011, Isaiah C. Ragan, Phone: 5104375429
 
E-Mail Address
Roderious.D.Harmon@USCG.MIL, isaiah.c.ragan@uscg.mil
(Roderious.D.Harmon@USCG.MIL, isaiah.c.ragan@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
ITEM 1: Folding Boom Cranes, Biennial Maintenance, Perform 1.� SCOPE 1.1� Intent.� This work item describes the requirements for the Contractor to inspect and test folding boom cranes listed in Table 1. TABLE 1 � LIST OF FOLDING BOOM CRANEs crane LOCATION MANUFACTURER / MODEL NUMBER coast guard tech pub Crane No.2 (Port Aft Near) port aft near) Main Deck, Port Side, AFT of Frame 90 Appleton Marine Inc. / FB90-28, S/N 20501-2 7903 Crane No.4 (Port Aft Far) port aft near) Main Deck, Port Side, AFT of Frame 90 Appleton Marine Inc. / FB90-28, S/N 20501-4 7903 Crane No.3 (Starboard Aft) port aft near) Main Deck, STBD Side, AFT of Frame 90 Appleton Marine Inc. / FB90-28, S/N 20501-3 7903 1.2� Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) Y *CB-OTH Mark IV (Coast Guard Drawing 26B-CB-IV-801-001) N/A 1 ea. N/A Y *Long Range Interceptor II (LRI-II) Cutter Boat N/A 1 ea. N/A *Government-loaned property, which must be returned to the vessel upon completion of the availability. **New or refurbished equipment that the Government may provide for installation in place of existing equipment. ***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center. 2.� REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-801-001 Rev B, Booklet of General Plan Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-100-083 Rev A, General Arrangements NSC5 & Follow (AS5100001) Coast Guard Drawing 750-WMSL-801-010 Rev A, Booklet of General Plan NSC 5 ONLY (ASC8011001E) Coast Guard Drawing 750-WMSL-100-531, Rev D, Structural Mods Iwo New Aft Folding Cranes, Hamilton, James & Munro Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves Coast Guard Publications Coast Guard Technical Publication (TP) 7903, SWBS 583, Apr 2019, Aft Boat handling system �Model FB90-28 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Other References The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal ANSI/EASA Standard AR100-2020,� Recommended Practice for the Repair of Rotating Electrical Apparatus. 3.� REQUIREMENTS 3.1 General. 3.1.1 CIR.� The Contractor must submit a CIR for the inspections listed in the following paragraph(s): 3.2 (Inspect and repair task particulars) � Task #1, #2, #3 and #7. 3.1.2 Tech Rep.� The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Folding Boom Cranes (i.e. Appleton Marine Inc. Model FB90-28) to accomplish the following on site: Advise on manufacturer's proprietary information pertinent to the system. Ensure compliance with manufacturer's procedures and standards during inspections, repairs, calibration and testing. 3.1.2.1 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their r�sum�. 3.1.2.2 Submit the name and r�sum� of the Tech Rep to the COR at the Arrival Conference. 3.1.3 Protective measures.� The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.3.1 Protective measures, hydraulic system(s). Maintain existing hydraulic system cleanliness and take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Immediately after disconnecting or removing components from the hydraulic system, seal all openings to the rest of the system using caps for externally threaded connection points, bolt-on blanks, or taped-on discs/covers made of durable plastic or sheet-metal that is no less than 1/16-inch thick. 3.1.4 Interferences.� The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).� Known interferences include, but are not limited to the following: Piping Electrical Cables NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 �Operational test, initial. ��Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. �Submit a CFR. 3.3 �Inspect and repair task particulars. �The Contractor with Tech Rep support must perform tasks listed in Table 2 in accordance with SFLC Std Spec 5000 and TP 7903. �See applicable drawings and Tech Pub in Section 2 for technical information and installation details. Table 2 � Task List ADDITIONal REQUIREMENTS # TASK TYPE QTY COMPONENT OR ASSEMBLY APPENDIX AND PARA. FROM sflc STD sPEC 5000 OTHER Tech Pub 7903 1 Operate and Inspect 3 Folding Boom Crane 3.2.1 Submit a CIR. Document the existing software program/version 2 Operate and inspect 1 Chest Pack (Chest Pack Controls and Junction Boxes) 3.2.1 Submit a CIR. Note: There is one chest pack.� It should be rotated between all three cranes. 3 Operate and inspect 1 Control Console 3.2.1 Submit a CIR. 4 Service and inspect 3 Crane Assembly 3.2.2 Perform all preventive maintenance actions as indicated on Table 4-1 of CG TP 7903, regardless of specified interval.� Inspect hydraulic hoses for leaks, abrasions, swelling and defects.� Inspect entire Folding crane assembly for signs of leakage, cracks, structural damage and deformations.� Submit a CFR. 5 Service and inspect 3 Cranes (Mechanical/Hydraulic) Inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, ELR Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib and Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit a CFR. 6 Partially Preserve 3 Folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, and 3.2.4.5.1 Perform in accordance with paragraph 3.3 of this work item. 7 Groom and Lubricate 3 Folding Boom Crane Assembly 3.2.6 Perform all of the lubrication requirements specified in Tables 4-3 and 4-4 of CG TP 7903. 8 Hydraulic Lube Oil Analysis 3 Hydraulic System C2.1.3.1 Submit a CIR. 9 Hydraulic Power Unit (HPU) 1 Hydraulic System C2.1.3.1 Inspect Prime Mover/Link Motor, HPU Pumps, HPU Reservoir, HPU Tank Heaters, Oil Cooler, HPU Manifold and hoes. HPU Temperature Transmitter, HPU Display, HPU Controls, Joysticks and Control Cabinet in accordance with TP 7903 10 System Relief Valves, Stiches and Indicators 1 Hydraulic System In accordance with TP 7903, Verify set points, adjustment and calibration on : Pump Compensator Relief Valve System Relief valve. Winch Limit adjustment. Load Monitor Indicators Crane Position Indicators Submit a CFR. 11 Disassemble and Inspect 1 Hydraulic Oil Heat Exchanger 3.2.3 Disassemble to the minimum extent necessary to clean the heat exchanger. 12 Aft Boat Hydraulics Crane Motor A and B 2 Hydraulic System Perform Insulation Resistance Test in accordance with ANSI/EASA AR 100-2020.and Section 3 of TP 7903 Submit a CFR. 13 Cranes 3 Electrical Inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood lights and Electrical Cables 14 Operational and Weight Test 3 Folding Boom Crane Assembly Perform in accordance with paragraph 3.5 of this work item. 15 Fabricate and Install 3 Label plate B2.9 Name Plate must also include additional information of Dynamic Load Test, Brake Test and WLL Weights. 3.3.1 �Materials. �The Contractor must provide all parts (i.e. all greases, lubricating oils, hydraulic fluid, hydraulic oil filters, tank breather elements and other miscellaneous materials) and materials including, but not limited to, the items listed in Table 3 below, to conduct the required maintenance actions listed above. TABLE 3 � List of pARTS QUANTITY PART NUMBER DESCRIPTION SOURCE OF SUPPLY 1 YMD-8861-R HPU Hydraulic Return Filter Appleton Marine Inc. 1 YMD-10416 HPU Hydraulic Return Filter 2 YMD-12209-R Pressure Filters (For Crane No.2 & 4) 1 YMD-12234-R (0280D005BH4HC) Pressure Filters (For Crane No.3) 1 YMD-12234-R (0060D005BH4HC) Pressure Filters (For Crane No.3) 3.3.2 Hose inspection.� The Contractor must visually inspect the condition of all flexible hoses and submit a CFR with the following: Hose physical condition Service life dates (date for required hose renewal; if not specified, add eight years to installation date) 3.3.2.1 If not present, the Contractor must provide new hose tags, in accordance with SFLC Std Spec 5000, Paragraph C2.2.1.4.� Ensure tag color coding of black on natural or black on white.� Ensure that tags must be attached using materials that will not damage hose assembly in any way, or interfere with the normal flexing motion of the hose. 3.3.2.2 The Contractor must stamp, engrave, or etch the following information on each tag.� Hand written information on each Tag is NOT acceptable. Utilize the Cutter�s hose log for information as necessary. Hose Log Item Number (Serial Number) Hydrostatic Test Pressure (psi) Hydrostatic Test Date (DD/MM/YY) Service Life (Replacement Date) Date (QTR ""Q""/FY) 3.4 �Preservation Requirements. The Contractor must perform the following work to accomplish the first bulleted requirement of SFLC Std Spec 5000 (Para 3.2.4.3.2). 3.4.1 �All other requirements as specified from SFLC Std Spec 5000 regarding �Partially Preserve� remain applicable. 3.4.2 �In addition to partial preservation, abrade entire crane surface and provide aesthetic top coat. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.5 �Operational and weight testing. �The Contractor must perform the Appleton Marine Inc. �Start-up and Overhaul Test Procedure�, Appendix A of CG TP 7903 (i.e. Items 1-10).� Static test (Item 2.1) is not required. Perform all testing with cutter at or near 0-degree trim and 0-degrees list. Record and provide all testing data of Appendix A, CG TP 7903 via a CFR. Utilize test weights that will ensure the boom can be extended horizontal in the notch. Note Certain water weight bags may be too large to fit within the notch. Ensure test weights are able to fit within the notch to accomplish all testing. 3.5.1 The Contractor must supply weights and a certified dynamometer to conduct load testing. �Perform all testing in the presence of the Coast Guard Inspector and the Tech Rep. �CAUTION Do not exceed the Working Load Limit (WLL) of the cranes for any of the tests listed in Appendix A, CG TP 7903. Exceeding the WLL could result in equipment damage and/or personnel injury. 3.5.2 �Upon successful completion of the load testing, operational testing must be performed using the various GFP small boats in accordance with the test procedure detailed in Appendix A, CG TP 7903. 3.5.3 �Operational test, post repairs.� After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.� 3.6 �Touch-up preservation.� The Contractor must prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.� Abide by all touch-up requirements outlined in SFLC Std Spec 6310. 4.� NOTES This section is not applicable to this work item.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6eb6203bd5ae49e2a8b666eecc22cdf8/view)
 
Place of Performance
Address: Alameda, CA 94501, USA
Zip Code: 94501
Country: USA
 
Record
SN06729165-F 20230629/230627230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.