Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 07, 2023 SAM #7892
SOLICITATION NOTICE

Z -- Z--INDE - BICENTENNIAL BELL GARDEN RESTORE

Notice Date
7/5/2023 6:08:52 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NER SERVICES MABO (43000) BOSTON MA 02129 USA
 
ZIP Code
02129
 
Solicitation Number
140P4223R0004
 
Response Due
7/13/2023 2:00:00 PM
 
Archive Date
07/28/2023
 
Point of Contact
De Leon, Wendy, Phone: 617-599-4957
 
E-Mail Address
Wendy_Deleon@nps.gov
(Wendy_Deleon@nps.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment issued to answer questions received after the site visit. 1. Will the tree at the South end of the garden be removed? Yes, the large tree near the southern entrance to garden will be removed per the Demolition Plan (C1). 2. Are the trees at the North end of the garden adjacent to the perimeter wall staying? Tree roots interfering with existing brick pavement. All of the existing trees along the northern perimeter wall are to remain. The Site Plan (L1) calls for stone fines to be installed in a new pathway system to replace the existing brick & stone fines pathways. 3. Are the stone fines staying? The existing stone fines (or stone dust) are to be removed and disposed per the Demolition Plan (C1). New stone fines are to be installed in proposed locations per Site Plan (L1). 4. Is the brick staying? And if so, is it required to save & reuse the existing brick? All brick pavers within the site limits are to be removed and disposed per the Demolition Plan (C1). See Site Plan (L1) for locations of proposed stone fines and/or clay pavers. 5. Is there any additional staging areas outside of the site? No, all staging areas and storage of materials or stockpiling are to be confined within the masonry walls that surround the garden (Section 1.4C & Section 1.4F) (01 11 00 � 6). 6. What is the Period of Performance for this project? As per SOL_140P4223R0004, the period of performance is 120 calendar days after receiving Notice to Proceed. 7. How big is the pipe diameter from water source? As per the Irrigation Plan (I1), the point of connection is to adapt to 1.5� SCH 40 PVC.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d01e4c8172134f2aa2f0ab71271371be/view)
 
Place of Performance
Address: Corner of 3rd & Walnut Streets, Philadelphia, PA 19106, USA
Zip Code: 19106
Country: USA
 
Record
SN06736886-F 20230707/230705230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.