SOLICITATION NOTICE
59 -- 59--CONNECTOR,ELECTRIC
- Notice Date
- 7/7/2023 12:59:47 AM
- Notice Type
- Solicitation
- NAICS
- 335931
— Current-Carrying Wiring Device Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010423RFC09
- Response Due
- 7/20/2023 11:00:00 AM
- Archive Date
- 08/04/2023
- Point of Contact
- Telephone: 7176053875
- E-Mail Address
-
JILL.SABOL@NAVY.MIL
(JILL.SABOL@NAVY.MIL)
- Description
- ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specificaiton section C| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|50|905|0001AB|Lot|See DD 1423|0001AC|1|420|0001AD|1|180||||||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report |Material - Inspection & Acceptance at SOURCE Certifications - Inspection at DESTINATION & Acceptance at OTHER |TBD|N00104|TBD|Certifications - N39040; Material -S4306A |N50286|TBD|133.2|N/A|N/A|N39040|N/A|N/A|See DD Form 1423|PORT_PTNH_WAWF_Notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from the date of delivery |one year from the date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|1|0001AD|7|180 days |jill.l.sabol.civ@us.navy.mil|TBD|0001AD|60|x|| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|1|0001AC|420|Receiving OfficerPortsmouth Naval Shipyard,Building 240, Code 270 Kittery Maine, 03904 phone 207-438-5445|120|x|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|335931|500|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2||| TYPE OF CONTRACT (APR 1984)|1|firm fixed price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JAN 2023))|1|| Closing date is extended to 7/14/23. Clauses are updated. Government furnished property clauses were added. FAT clauses were updated. Line item 0001AD added for contractor destructive FAT. Time of delivery updated to allow time for contractor destructive FAT and government destructive FAT. See 52.211-8. The complete RFP package must be signed and returned prior to the closing date. Emailed proposals are acceptable. NECO quotes will NOT be accepted and will be determined non-responsive. \ Closing date extended to 7/7/23. 1. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 2. Any contract/order awarded as a result of this solicitation will be a ""DO"" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 3. Vendors submitting quality manuals shall submit them to jill.sabol@navy.mil. 4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. 5. If drawings are included in the solicitation, access must be requested on the individual solicitation page on Contract Opportunities via the Government's SAM.gov website. Include your CAGE code in your request. 6. Unless otherwise stated on the DD1423, submission of DD1423 certification 3ata (CDRLs) will be on or before 20 days prior to the material delivery date. PNSY review/acceptance of CDRLs shall be 6 working days after receipt of CDRLs. Final delivery of material will be on or before 365 days after the effective date of the contract. 7. Contractor Destructive FAT and Gov't Destructive FAT are required. See 52.209-3 and 52.209-4. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;NSN 1H-5995-01-481-6257, cables, can be furnished to the successful bidder for the required hydrostatic testing.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 Specification Revisions - The specification revisions listed under ""Documents References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.3 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. DRAWING DATA=349-CAS-20-014-8 |88594| -|SP |D|0001 | |49998|1099315 DRAWING DATA=7349938 |53711| E| |D|0001 | |49998|0352821 DRAWING DATA=7349938 |53711| C|PL |D|0001 | C|49998|0022124 DRAWING DATA=7349938 |53711| C|PL |D|0002 | C|49998|0034149 DRAWING DATA=7349938 |53711| C|PL |D|0003 | C|49998|0037280 DRAWING DATA=7349938 |53711| C|PL |D|0004 | C|49998|0025307 DRAWING DATA=7349939 |53711| A| |D|0001 | A|49998|0172506 DRAWING DATA=7349940 |53711| -| |D|0001 | -|49998|0079530 DRAWING DATA=7349941 |53711| -| |D|0001 | -|49998|0093484 DRAWING DATA=7349942 |53711| B| |D|0001 | |49998|0019740 DRAWING DATA=7349943 |53711| -| |D|0001 | -|49998|0485914 DRAWING DATA=7349944 |53711| -| |D|0001 | -|49998|0470758 DRAWING DATA=7349945 |53711| -| |D|0001 | -|49998|0390422 DRAWING DATA=7349946 |53711| C| |D|0001 | C|49998|0048488 DRAWING DATA=7349946 |53711| C|PL |D|0001 | C|49998|0020918 DRAWING DATA=7349946 |53711| C|PL |D|0002 | C|49998|0021678 DRAWING DATA=7349947 |53711| A| |D|0001 | A|49998|0275414 DRAWING DATA=7349947 |53711| A|PL |D|0001 | A|49998|0028893 DRAWING DATA=7349947 |53711| A|PL |D|0002 | A|49998|0036359 DRAWING DATA=7349948 |53711| A| |D|0001 | A|49998|0086262 DRAWING DATA=7349949 |53711| A| |D|0001 | A|49998|0086541 DRAWING DATA=7349950 |53711| -| |D|0001 | -|49998|0254404 DRAWING DATA=7349951 |53711| A| |D|0001 | A|49998|0067891 DRAWING DATA=7349952 |53711| A| |D|0001 | A|49998|0070994 DRAWING DATA=7349953 |53711| A| |D|0001 | A|49998|0071623 DRAWING DATA=7349954 |53711| -| |D|0001 | -|49998|0052586 DRAWING DATA=7349955 |53711| -| |D|0001 | -|49998|0062396 DRAWING DATA=7349956 |53711| A| |D|0001 | A|49998|0060537 DRAWING DATA=7349957 |53711| -| |D|0001 | -|49998|0663556 DRAWING DATA=7349958 |53711| D| |D|0001 | D|49998|0041848 DRAWING DATA=7349959 |53711| A| |D|0001 | A|49998|0049297 DRAWING DATA=7349960 |53711| -| |D|0001 | -|49998|0057793 DRAWING DATA=7349960-2 |53711| -|1N |D|0001 | -|49998|0734461 DRAWING DATA=7349961 |53711| -| |D|0001 | -|49998|0050601 DRAWING DATA=7349961-2 |53711| -|1N |D|0001 | -|49998|0673832 DRAWING DATA=7349962 |53711| -| |D|0001 | -|49998|0047657 DRAWING DATA=7349963 |53711| -| |D|0001 | -|49998|0064823 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |211201|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;The Electrical Connector Assembly must be in accordance with Naval Sea Systems Command Drawing 7349938, Parts List PL7349938, MIL-DTL-24231, Notice of Revision 7349960-2, and Notice of Revision 7349961-2, except as amplified or modified herein.; 3.2 ;The Contractor/CAGE to be marked on the nameplate must be the actual Contractor/CAGE that is awarded the contract in lieu of as indicated in note #9 of NAVSEA drawing 7349958.; 3.3 ;First Article Approval (Contractor Testing) - First Article Test (FAT) and approval of cabling is required in accordance with 359-CAS-20-014-8 Paragraph 3.3.6.; 3.4 ;Where Drawing 7349957 Note 3 indicates, Specification 349-CAS-20-014-8 must be used in lieu of Specification NUWC-C-3421/1169-608.; 3.5 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.6 ;The FAT sample(s) must not be delivered against the contract quantity.; 3.7 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Hull Penetrator Body on Drawing 7349939; Penetrator Washer Flat on Drawing 7349940; Penetrator Nut Retaining on Drawing 7349941; Penetrator Gland Nut on Drawing 7349944; and Penetrator Hex Socket Bolt on Drawing 7349942; Material - ;QQ-N-286, Form 2, Annealed, Hot-Finished, and Age Hardened; and the hardness requirement of MIL-DTL-24231 paragraph 3.5.5.1; Part - ;Receptacle Body, Find No. 1 on Drawing 7349946 and PL7349946; Material - ;QQ-N-286, Form 2, Annealed, Hot-Finished, and Age Hardened; 3.8 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Production tests; Item - ;Each connector assembly; Performance - ;Drawing 7349938 note 13; Acceptance - ;Drawing 7349938 note 13; Test - ;Dye Penetrant Inspection; Item - ;Hull Penetrator Body on Drawing 7349939; Penetrator Washer Flat on Drawing 7349940; Penetrator Nut Retaining on Drawing 7349941; Penetrator Gland Nut on Drawing 7349944; and Receptacle Body on Drawing(s) 7349946 and PL7349946; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Liquid Penetrant Inspection; Item - ;Penetrator Hex Socket Bolt on Drawing 7349942; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Attribute - Annealing and Age Hardening Item - ;Hull Penetrator Body on Drawing 7349939; Penetrator Washer Flat on Drawing 7349940; Penetrator Nut Retaining on Drawing 7349941; Penetrator Gland Nut on Drawing 7349944; Receptacle Body on Drawing(s) 7349946 and PL7349946; and Penetrator Hex Socket Bolt on Drawing 7349942; Performance - QQ-N-286 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 Attribute - ;Post Glass Sealing Hardness Reading; Item - ;Receptacle Body, Find No. 1 on Drawing 7349946 and PL7349946; Performance - ;Note 12 of Drawing 7349946; Test - Quality Conformance/Compliance Inspection Item - ;Cable Specimen; Performance - ;359-CAS-20-014-8 Paragraph 4.1.1.8; Acceptance - ;359-CAS-20-014-8 Paragraph 4.1.1.8; Attribute - ;Time/Temperature Heat Treatment Record; Item - ;Glass Sealed Receptacle; Performance - ;Note 11 of Drawing 7349946; Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.10 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.11 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.11.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.11.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.11.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one ""test specimen fastener"" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.12 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.13 K-MONEL Fasteners - Material must be heat treated per QQ-N-286. 3.13.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the annealed and age hardened material and must meet the requirements of QQ-N-286. 3.13.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be cut or ground only. 3.14 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.15 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.16 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.17 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.17.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.17.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.17.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.18 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.19 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.20 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.20.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.21 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.22 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.22.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.22.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.22.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the contract. 3.22.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.22.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.22.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.22.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.22.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.22.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.22.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved bythe Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.22.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.22.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.23 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;destructive; First Article Test/Inspection on ;one (1) Cable Specimen; unit(s) in accordance with requirements ;of 359-CAS-20-014-8 Paragraph 4.1.1.5; . 3.24 First Article Test/Inspection (Government) - ;Destructive; - The Contractor shall deliver ;one (1) Electrical Connector Assembly; unit(s) to ;Receiving OfficerPortsmouth Naval Shipyard,Building 240, Code 270. (207-438-5445)Kittery Maine, 03904; for First Article Tests in accordance with the ;requirements of MIL-DTL-24231 for Type III connectors; . 3.25 Quality System Requirements - The Contractor furnishing items under this con...
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/0e22acbc809b48a0a20d4a1cdd2b726a/view)
- Record
- SN06740816-F 20230709/230707230045 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |