56 -- Stormwater Drainage Pipes Survey

Notice Date
7/12/2023 2:32:36 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
FA4819 325 CONS PKP TYNDALL AFB FL 32403-5521 USA
 
ZIP Code
32403-5521
 
Solicitation Number
FA481923QA037
 
Response Due
7/28/2023 11:00:00 AM
 
Archive Date
08/12/2023
 
Point of Contact
2LT Kenneth Lewter, Nelson Kraemer
 
E-Mail Address
kenneth.lewter.1@us.af.mil, nelson.kraemer@us.af.mil
(kenneth.lewter.1@us.af.mil, nelson.kraemer@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This acquisition will be 100% total SMALL BUSINESS SET-ASIDE The intent of this project is to clean and evaluate for repair approximately 3,400 LF of 48� degraded Reinforced Concrete Pipe(RCP) and approximately 800 LF of 30� degraded RCP on Tyndall AFB. Cleaning/evaluation will also include associated storm manholes and collectors and tributary entry points of miscellaneous lines to the above manholes and collectors. It is suspected that pipe joints and possible fractures are allowing infiltration of ground waters and that these points are a probable cause of localized sink holes. Past drainage studies note several areas where sinkholes and piping are evident, some of the sinkholes may have increased in size and/or may have been temporarily filled with soils as a interim safety measure. In event that collapsed sections are observed, those sections may be replaced under separate contract - this contract does not include full pipe section replacement, nor does it include any repairs. It is unknown if any asbestos containing material (ACM) or if clay pipe was incorporated into this system. Mortar type and quantity is unknown but it is suspected that loose and missing mortar at the joints are a contributing factor to infiltration and exfiltration, which this inspection and evaluation is meant to address. Previous repair status is also unknown. Contractor shall be responsible for verification of all existing conditions and utilities and access protocols prior to execution of the work. Some of the work may require access to the WSEP ramp and field between the WSEP Ramp and Taxiway Papa. There will be no site visit. �� Questions Due: No later than 1:00 PM CST, 7 July 2023 Quote Due Date: No later than 1:00 PM CST, 14 July 2023 This solicitation includes the clause at FAR 52.204�27, Prohibition on a ByteDance Covered Application First set of questions and answers has been added.� See attached document ""questions and answers to Stormwater Drainage Survey"" New set of questions and answers has been added ""Questions and Answers to Stormwater Drainage Survey R1"".� In total there has been twenty-seven questions. Twenty-seven questions have been answered.� Ten on document attached ""Questions and Answers to Stormwater Drainage Survey"" and seventeen on document attached ""Questions and Answers to Stormwater Drainage Survey R1"".� Disposal Picture, SAM.GOV and Storm System Flow to East Bay are added for clarifications to questions an answers on document�""Questions and Answers to Stormwater Drainage Survey R1""
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2abfcd969021495ba8599140e30a0204/view)
 
Place of Performance
Address: Panama City, FL 32405, USA
Zip Code: 32405
Country: USA
 
Record
SN06746103-F 20230714/230712230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.