SOLICITATION NOTICE
Y -- SAO-HI (SMA): PACU Replacement
- Notice Date
- 7/13/2023 5:54:47 AM
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- SMITHSONIAN INSTITUTION ARLINGTON VA 22202 USA
- ZIP Code
- 22202
- Solicitation Number
- 33330223RF0010042
- Response Due
- 8/31/2023 12:00:00 PM
- Archive Date
- 09/15/2023
- Point of Contact
- Virginia Chan, Phone: 2026337253, Willard Powell, Phone: 2026337286
- E-Mail Address
-
Chanvc@si.edu, powellwb@si.edu
(Chanvc@si.edu, powellwb@si.edu)
- Description
- PACKAGE AIR CONDITIONING UNIT (PACU) REPLACEMENT FOR SMITHSONIAN ASTROPHYSICAL OBSERVATORY, SUBMILLIMETER ARRAY BASE FACILITY (SMA) IN MAUNAKEA SCIENCE RESERVE, HAWAII The Smithsonian Institution (SI) is seeking offers for Package Air Conditioning Unit (PACU) Replacement at the Smithsonian Institution�s SMA Facility, located in Mauna Kea Science Reserve, Hawaii. The North American Industry Classification System (NAICS) code for this action is 236220 and the small business size standard is $39.5M. PROJECT INFORMATION: The Work includes but is not limited to the following: Removal of existing HVAC equipment, including Package Air Conditioning Unit (PACU), outside air supply fans, space exhaust fans, ducts, ductless split systems, dampers, sensors, and controls Removal of existing electrical power supply for the above equipment, Removal of miscellaneous lighting fixtures Removal of existing clean agent fire suppression system, including cylinders, piping, and controls Removal of existing fire alarm equipment, including detectors, annunciators, and controls. Provision of: new custom factory fabricated Air Handling Unit (AHU); two new chillers with integral pumps and hydronic equipment; new VAV terminal units and motorized dampers, two new outside air supply fans with duct-mounted electric heating coils; one new direct expansion Fan Coil Unit (FCU); one new Variable Refrigerant Flow (VRF) system with four indoor units; one new and complete Direct Digital Control (DDC) system; new dampers and controls to integrate with the clean agent fire suppression system; revisions to existing ducts and equipment; and all material and appurtenances to support the aforementioned work New equipment and revisions to existing electrical equipment to provide electrical service to the above equipment New clean agent fire suppression system, including cylinders, piping, and controls New Fire Alarm (FA) system, including space-mounted smoke and heat detectors, air sampling smoke detectors, annunciators, and controllers Removal of existing and reinstallation of existing ceiling tiles and grid; patching of existing walls; painting of new exterior equipment; new structural steel supports; and other architectural and structural work in support of the above equipment Critical Elements of the Work: The successful Contractor shall be fully qualified to install critical elements of the Work. Installation, connection and commissioning of proposed HVAC system The facility will remain in operation for the duration of the project. Project shall include the provision of temporary HVAC for all spaces by using some new equipment in temporary locations and temporary relocation of some existing equipment. Cultural aspects of the site dictate limits acceptable arrangement of exterior equipment. The indicated exterior equipment arrangement and locations shall be strictly adhered to Facility shall have continuous electrical power throughout operation. Electrical power shutdowns to be limited to agreed upon durations. Installation of the new fire suppression system shall be phased. The control panel and detection systems shall be installed in their final location, as they don�t conflict with the existing. Initially, some of the new suppression cylinders shall be installed in a temporary location and system commissioned and tested, after which the existing system can be demolished. A second phase shall have the remainder of the cylinders and all of the piping installed. Cylinders that were temporarily installed elsewhere shall then be installed in the storage room. A final test shall be performed. During construction of the new FA alarm, the existing FA system shall remain in place and operational to preserve life safety. The existing FA system shall not be demolished until the new FA system has been installed and provides sufficient coverage for life safety. The Period of Performance for the Base Contract is 570 Calendar Days from the date of Notice to Proceed. Total Estimated cost range is between is $1M and $5M. LOCATION: Project will be located at Smithsonian Astrophysical Observatory, Submillimeter Array Facility, Maunakea Science Reserve, Hawaii. THIS IS NOT A REQUEST FOR PROPOSAL. The full solicitation, request for proposals, will be released on or about 26 July 2023; however, there is no guarantee or implication of a guarantee this this project will be solicited. Responses will be due within (35) days of release. Electronic copies will be uploaded to SAM.gov site. This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Smithsonian Institution will accept proposals from all qualified offerors. The Smithsonian Institution�s evaluation panel will be the sole entity to determine as to whether an offeror is capable of meeting the requirements to carry out contract performance. No attachments or links have been added to this opportunity.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/a2d1844bb4a149f8854526341905afa5/view)
- Place of Performance
- Address: Hilo, HI 96720, USA
- Zip Code: 96720
- Country: USA
- Zip Code: 96720
- Record
- SN06747523-F 20230715/230713230053 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |