Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 16, 2023 SAM #7901
SOLICITATION NOTICE

J -- POLAR STAR DD FY23 Carpet Renewal

Notice Date
7/14/2023 9:58:11 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08523P017790
 
Response Due
7/21/2023 8:00:00 PM
 
Archive Date
07/21/2023
 
Point of Contact
KYLER FISK, Phone: 9492881271, Tyler Melton, Phone: 5104375437
 
E-Mail Address
KYLER.C.FISK@USCG.MIL, Tyler.k.melton@uscg.mil
(KYLER.C.FISK@USCG.MIL, Tyler.k.melton@uscg.mil)
 
Description
1.1� Intent.� This work item describes the requirements for the Contractor to renew interior deck coverings with a polymeric deck covering system (MIL-PRF-24613, Type III, Epoxy). 3.1� General. 3.1.1� CIR. None. 3.1.2� Technical Representative. Not applicable. 3.1.3� Protective measures.� The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. 3.1.4� Interferences.� The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).� 3.2� Deck covering replacement.� Follow all general deck covering and fire prevention requirements stated in SFLC Std Spec 6341. 3.2.1� Deck covering locations: Table 2 - WORK Locations Location Compartment Interferences Sq. Ft. (approx.) 01 Level Passageway 01-85-2-L Carpet 140 01 Level Passageway 01-68-0-L Carpet 290 01 Level Passageway 01-85-1-L Carpet 140 01 Level Passageway 01-49-0-L Carpet 385 3.2.2� Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants. 3.2.2.1 Ultrasonic thickness measurement.� Prior� to priming deck surfaces, in the presence of the Coast Guard Inspector, perform a UT inspection of the affected plating in accordance with SFLC Std Spec 0740, to determine the plate thickness (one shot per square foot).� Chalk out the boundary of the corroded plating where the remaining thicknesses are less than 75% of the original thickness as shown on applicable Coast Guard Drawings.� See Figure �Minimum Allowable Plating Thickness� below for guidance.� Submit a Condition Found Report to the Coast Guard Inspector. 3.2.3 Apply appropriate deck covering system primer coat in accordance with SFLC Std Spec 6310 and manufacturer�s instructions. 3.2.4� Install underlay material in the work areas conforming to MIL-PRF-3135 in accordance with SFLC Std Spec 6341 and Manufacturer�s Instruction.� Underlay material shall be compatible with the deck covering system being installed.� For bidding purposes, the Contractor shall provide twice the required amount of underlay material to do the work. 3.2.5� Install polymeric deck covering system in the work areas in accordance with SFLC Std Spec 6341.� Polymeric system shall conform to MIL-PRF-24613, Type III, Epoxy Color shall be chosen by the cutter, here are some choices: http://www.hitechflooring.com/epoxy_flooring_colors.shtml. 3.2.6� Thoroughly seal the deck covering system with two coats of sealer, in accordance with manufacturer�s instructions. NOTE Install sealer coats as thin as possible while still coating the entire surface so that a slip resistant orange peel effect is present on the finished deck. 3.2.7� Caulk all edges of decking after poured deck covering has cured to prevent water intrusion under deck. 3.3� Touch-up preservation.� The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310.� Abide by all touch-up requirements outlined in SFLC Std Spec 63104.� NOTES 3.4� Period of Performance. 3.4.1 Work to be completed at Mare Island Dry Dock facility, located at 1180 Nimitz Ave, Vallejo, CA 94592 between 5/1/2023 � 8/1/2023.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/55c90df2337d4919b7d745a517454778/view)
 
Place of Performance
Address: Vallejo, CA 94592, USA
Zip Code: 94592
Country: USA
 
Record
SN06749200-F 20230716/230714230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.