SOLICITATION NOTICE

Z -- EHRM Infrastructure Upgrades Billings MT

Notice Date
7/14/2023 12:52:28 PM
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NETWORK CONTRACT OFFICE 19 (36C259) Greenwood Village CO 80111 USA
 
ZIP Code
80111
 
Solicitation Number
36C25923R0098
 
Response Due
8/7/2023 9:00:00 AM
 
Archive Date
09/06/2023
 
Point of Contact
Victor Favero, Contract Specialist, Phone: 918-577-3838
 
E-Mail Address
victor.favero@va.gov
(victor.favero@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
SCOPE OF WORK EHRM INFRASTRUCTURE UPGRADES Billings Majestic & Spring Creek PROJECT NAME: EHRM Infrastructure Upgrades Billings Majestic CBOC (Two Locations) & Billings Spring Creek 1. GENERAL INTENT: The contractor will provide construction work necessary at this CBOC site to support the Veterans Health Administration s (VHA) change to the new Electronic Health Record Management (EHRM). VHA requests the contractor provide construction services to include all labor, materials, tools, equipment, transportation, supervision, and other services necessary to upgrade the VA leased property in accordance with this scope of work. Name Room Cabling Patch Panels Fiber Power Bonding UPS Dedicated Cooling Temp Humidity Racks Sensors Space Billings Majestic 1 NO NO X NO X NO NO NO NO X NO Billings Majestic 2 X X X NO X X X X X X X Billings Spring Creek 1 NO NO N/A NO X X X X X X NO As part of the scope of work requirements, Contractor is expected to complete items designated w/ an X for each of the server rooms as shown on the table above. For example, Billings Majestic Server Room #2 requires a space expansion due to current size not meeting the EHRM standards. It is strongly recommended that a detailed inspection of the premises, schematic drawings and specifications be initiated, by the Contractor, to determine actual needs and conditions for the construction of this project. It is highly recommended that the Contractor attend a scheduled site visit to verify site conditions, determine the type of equipment needed, the number of personnel required and the level of effort to complete the job in the time framed specified in the section, Period of Performance, below. 2. STATEMENT OF WORK: 2.1 The Contractor shall ensure all below requirements from the VA Office of Electronic Healthcare Modernization Site Infrastructure and End User Device Requirements are met. 2.2 Local Area Network (LAN) 2.2.1 References: Telecommunications and Special Telecommunications Systems Design Manual, https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf and Infrastructure Standard for Telecommunications Spaces, Version 3.0, https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf. 2.2.2 Horizontal cabling shall be Category 6 (Cat6) or higher (ANSI/TIA-1179 Healthcare Facility Telecommunications Infrastructure). If existing horizontal cabling is not minimally Cat6, Contractor shall upgrade to Category 6A (Cat 6A). 2.2.3 Telecommunications outlets/connectors and the horizontal cross-connects (patch panels) shall be of equal or greater Category to connected horizontal cable. 2.2.4 Installation shall be compliant with the BICSI standards (ANSI/NECA/BICSI 568, Standard for Installing Commercial Building Telecommunications Cabling and ANSI/TIA-1179-A Healthcare Facility Telecommunications Infrastructure for new installations). 2.2.4.1 New cable installations additionally shall be compliant with TIA 568.2-D, TIA TSB-184-A, and NFPA-70 Section 725.144 to prevent PoE heat accumulation. 2.2.4.2 Alternatively, new UTP cabling shall carry a UL listed ""LP"" (Limited Power) rating. 2.2.4.3 Cat6A cable shall be terminated to a CAT6A RJ-45 patch panel in IT closet and CAT6A RJ-45 jack at wall plate and labeled at both ends. 2.2.4.4 Use a cable analyzer to determine cable length (max cable length 90M/295 linear feet) and certify that cable meets or exceeds TIA-EIA-568-C.2. 2.2.4.5 Cables shall be installed in continuous lengths from origin to destination, no splices with a 1 service loop. 2.2.4.6 All new cable installation shall be tested and certified that cable meets or exceeds TIA-EIA-568-C.2. Provide the certification report to COR. 2.2.5 All patch cables shall be Category 6A for copper, OM4 for multi-mode fiber or OS2 level for single mode fiber. (Note: Only for room that will be enlarged (Behavioral Health)). 2.2.6 Cable management shall be implemented for all patch cables in accordance with Infrastructure Standard for Telecommunications Spaces, Version 3.0, ensuring proper bend radius, bundling, airflow, support and labeling. 2.2.7 1 GbE connectivity to desktops, and other EUD. 2.2.8 End-to-End latency from the user desktop to Cerner Data Center of equal to or less than 90ms for Citrix connection. 2.2.9 Provide additional data drops and network ports in Telecommunication Rooms (TR) to support required network printers and medical devices per Cerner Current State Review (CSR). If the CSR is not provided as an attachment to this document, an additional Supplemental Lease Agreement may be required. 2.2.10 Copper structured cabling shall be certified as meeting or exceeding TIA-EIA-568.1-D (max fixed cable length 90M/295 linear feet) independent of media type. 2.2.11 Contractor shall provide service with a minimum of 10 GbE fiber or better. 2.2.12 Network Infrastructure devices supported by UPS and/or [Emergency Power / Backup Generator as described below in 2.4]. 2.2.13 Contractor shall ensure 99.9% local area network performance levels, excluding scheduled downtime. 2.3 Power 2.3.1 UPS Functional Requirements 2.3.1.1 All UPS units supporting Information Technology infrastructure shall be functional and maintain a 30-minute run-time. 2.3.1.2 All units within one (1) year of end of life by facility Go-Live shall be replaced with new units. 2.3.1.2.1 End of Life for stand-alone units assumed to be six (6) years from date placed into service. 2.3.1.2.2 End of Life for UPS batteries assumed to be three (3) years from date replaced. 2.3.1.3 Most Community Based Outpatient Clinics and other leased spaces are defined as Life Safety Protected for Physical Security and Resiliency design. However, if a specific location was designated as Mission Critical, all equipment in TR shall be connected to the critical electrical branch and Emergency Power / Backup Generator. 2.3.2 Upstream bonding requirements to the Secondary Bonding Busbar or Primary Bonding Busbar must use two lugs. Bonding for telecommunications equipment must be performed per manufacturer's specifications. All grounding shall comply with ANSI/NECA/BICSI 607-C, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, November 2015.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b5a065efe7d44ea1beb111ebb31d688b/view)
 
Place of Performance
Address: Benjamin Charles Steele VA Clinic 1766 Majestic Ln, Billings, MT 59102, USA
Zip Code: 59102
Country: USA
 
Record
SN06749442-F 20230716/230714230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.