Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 19, 2023 SAM #7904
SOLICITATION NOTICE

61 -- Fort Peck Station Battery Replacement

Notice Date
7/17/2023 11:29:40 AM
 
Notice Type
Solicitation
 
NAICS
335910 —
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F23Q0040
 
Response Due
7/24/2023 12:00:00 PM
 
Archive Date
08/08/2023
 
Point of Contact
Lynne D. Reed, Phone: 4029952039, Daniel D. Monahan
 
E-Mail Address
lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil
(lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
AM0003 - Offer Due Date has been changed to the 24th of July on or before 2:00 PM CT.� Please ensure to acknowledge all amendments when sending in the Offer. ================================================================================================ AM0002 - is now ready for your review of the uploaded documents which includes: AM0002 that includes the offer due change to 18 July 2023 by 2:00 PM CT, Change to the Statement of Work (SOW) and Price Schedule; Appendix A, B, & C, Battery Room Access, MPF-OPN83E1601_003, MFP-OPN83E1602_017, & MFP-OPN83E1650_008 and two Images (IMG_2986 & IMG_2897). Note***All amendments need to be acknowledged and provide when submitting the offer. BIDDER INQUIRY QUESTIONS AND ANSWERS: Contractors the questions that have been provided to Contracting have been answered and the file name is FP Station Battery Replacement Bidder Inquiry.� Please see the document in the attachments.� In addition, the SOW and CLIN schedule along with the updated Offer Due Date change will be provided in an upcoming Amendment next week.� Please stay tuned for that amendment for important details. Please DO NOT send in your offer for the FP Station Battery Replacement on 6 July.� There will be a time extension provided with the Amendment ================================================================================================= ATTENTION CONTRACTORS: Please ask all questions by sending the Contracting Specialist an email directly instead of looking for the Projnet link.� Due to timing of when the quotes are due, an amendment cannot be completed at this time.� Therefore, all questions be directed to the Contracting Specialists email (lynne.d.reed@usace.army.mil).� All questions need to be to her by COB on Wednesday 28 June 2023.� All answers will be provided to the contractors by 2:00 PM on 30 June 2023.�� =================================================================================================== Site Visit Sign-In Sheet is uploaded in the Attachments Section. ========================================================================================= AM0001 - Amendemnt 0001 is posted in the Attachments.� Be sure to include acknowledgement any and all amendments when submitting your companies quote by including a signed copy of the amendment(s). ========================================================================================= Project Description:� The Fort Peck Project is located in Fort Peck, Montana on the Missouri River, approximately 20�miles from Glasgow, Montana. There are two plants; Plant 1 contains three generating units; Plant 2 contains two generating units. The Fort Peck Batteries have reached end-of-life cycle and exhibiting signs of failure, it is imperative to start a replacement process. This project will involve the replacement and testing of the Station Service Battery system at�the Ft Peck Project. The contractor shall supply and install the following components: a. Power Plant #1 UPS Battery: Procurement of one (1) each sixty (60) cell stationary flooded cell lead acid battery bank. b. Power Plant #1 Station Service Battery: Procurement of one (1) sixty (60) cell stationary flooded cell lead acid battery bank. c. Power Plant #2 Station Service Battery Testing: Capacity testing of one (1) existing sixty (60) cell stationary flooded cell lead acid battery bank located in Power Plant #2. d. Power Plant #1 UPS Inverter/Charger: Optional - Procurement of One (1) Inverter Charger e. Power Plant #1 & 2 Battery Chargers: Optional - Procurement of Four (4) Battery Chargers f. New Battery Rack: Optional - Provide and install if replacement batteries are not compatible with the existing battery rack.� The Contractor will be required to commence work upon receipt of contract award and complete the work 210 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.� Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27.� The site visit is tentatively scheduled for 20 June 2023 at 0900 MT. See Statement of Work for more details. Estimated Construction Costs (only include if applicable): The estimated construction cost of this project is between $250,000 and $500,000.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5436c5bcc5c34363b4fa8c787b04958e/view)
 
Place of Performance
Address: Fort Peck, MT 59223, USA
Zip Code: 59223
Country: USA
 
Record
SN06752045-F 20230719/230717230055 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.