Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 19, 2023 SAM #7904
SOLICITATION NOTICE

72 -- 20290PR230000226 Frost Park Repairs

Notice Date
7/17/2023 9:59:10 AM
 
Notice Type
Solicitation
 
NAICS
339999 — All Other Miscellaneous Manufacturing
 
Contracting Office
11TH COAST GUARD DISTRICT OFFICE ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
20290PR230000226
 
Response Due
7/21/2023 5:00:00 AM
 
Archive Date
08/05/2023
 
Point of Contact
Jared Osborne, Phone: 916 643-7669
 
E-Mail Address
Jared.A.Osborne@uscg.mil
(Jared.A.Osborne@uscg.mil)
 
Description
STATEMENT OF WORK Frost Park Repairs USCG Air Station Sacramento 1.0 GENERAL REQUIREMENTS 1.1 PROJECT DESCRIPTION During the unprecedented storms experienced in Sacramento this past winter, the unit received heavy rains & strong winds that caused significant damage to our recreation area, Frost Park. The metal roof panels of the existing pavilion structure were blown off by the winds. The current design is not suitable for the extreme winds received at the airfield. The support structure is failing and made from wood which is aged and suffering from dry rot. Last known repairs to the structure date back to 2008. Replacing this wood pavilion section with a covered aluminum or comparable structure will prove to withstand the extreme temperatures and high winds throughout the year. Area of structure in need of replacing is approximately 14 ft x 35 ft & 13 ft x 24 ft and will need to be tied into the center pavilion structure. 1.1.1 Technical Point of Contact (POC): LT JAMES DUHAMEL (774) 303-0798 MKC ART CASTANEDA (626) 497- 6000 1.2 LOCATION 1.2.1 Work to be conducted at USCG Air Station Sacramento. 6037 Price Ave McClellan, CA 95652 1.3 AIR STATION AND LOCAL REGULATIONS 1.3.1 The work site is on Government property. All rules and regulations issued by the Commanding Officer covering safety, vehicle operation, and sanitation must be observed by the Contractor and their employees at all times. 1.3.2 All personnel employed on site shall keep within the limits of the work and shall not enter any restricted area unless required or escort by a unit member. The Contractor�s equipment shall be conspicuously marked for identification. 1.3.3 The Contractor shall control its employee�s traffic on site. Parking for workers shall be at a suitable location as directed by the Technical POC. 1.3.4 The Contractor shall coordinate work with the technical POC to minimize any disruption to normal unit operations. 1.3.5 Unit is available for site visits, 0730-1400 Monday-Friday, through prior coordination with POC. 1.4 DAMAGE TO GOVERNMENT PROPERTY 1.4.1 Any damage caused to Government or private property shall be corrected at the Contractor�s expense. 1.5 SAFETY AND SECURITY 1.5.1 The Contractor shall provide all necessary safety equipment to protect the work site area. All work shall be performed in accordance with O.S.H.A. Safety standards to prevent injury to by-passers or workforce. 1.5.2 Contractor shall comply with Federal and State of California safety and health regulations. When standards differ, the more stringent shall apply. All accidents and property damage shall be reported to the Technical POC. 1.5.3 The Contractor shall be responsible for the security of their material, tools and equipment. The Government shall not be responsible for their loss. 1.5.4 The Contractor shall comply with all rules and regulations issued by the National Fire Protection Association covering the use and storage of flammable mixtures or material which might constitute a fire hazard. 2.0 EQUIPMENT 2.1 Contractor shall provide whatever equipment necessary to complete the work outlined in the scope, along with post installation inspection. 3.0 SCOPE OF WORK 3.1 Provide all labor, equipment, and materials to complete the pavilion structure construction to include: 1. Lock-Out/Tag-Out of any existing power sources. 2. Engineer & design custom patio structure for commercial specifications. 3. Construct and install new patio structure. 4. Secure support posts to concrete foundation. 5. Tie-in new structure to existing center pavilion. 6. Dispose of any materials used or removed from the system. 3.2 The unit will perform the demolition of the existing structure prior to contract work commencing. 3.3 Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative. 3.4 The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement. 3.4.1 Project is to be completed within 30 days of the contract being awarded. 3.5 The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site. 3.6 The Contractor shall remove all debris, rubbish and hazardous waste from the job site. 3.7 The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection. 3.8 The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected. 3.9 Unsatisfactory performance shall result in work being re-accomplished at no cost to the government. 3.10 It is the contractor�s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal. 3.11 Point of contact (POC) is LT JAMES DUHAMEL (774) 303-0798. Send all quotes to SK3 Jared Osborne Jared.A.Osborne@uscg.mil 6037 Price Ave. McClellan AFB, CA 95652 ? : (916) 643-7669
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/04dbeff879b842a69ea343bf23d5c0c8/view)
 
Place of Performance
Address: McClellan, CA 95652, USA
Zip Code: 95652
Country: USA
 
Record
SN06752209-F 20230719/230717230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.