Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 20, 2023 SAM #7905
SOURCES SOUGHT

99 -- Design Build for Installation of Natural Gas Heater at Hanscom AFB Gas Take Station

Notice Date
7/18/2023 1:38:04 PM
 
Notice Type
Sources Sought
 
NAICS
237120 — Oil and Gas Pipeline and Related Structures Construction
 
Contracting Office
FA2835 AFLCMC HANSCOM PZI HANSCOM AFB MA 01731-2107 USA
 
ZIP Code
01731-2107
 
Solicitation Number
23-HAFBPZI-001
 
Response Due
8/17/2023 11:00:00 AM
 
Archive Date
08/19/2023
 
Point of Contact
Marcus Green, Elizabeth Martineau
 
E-Mail Address
marcus.green.7@us.af.mil, elizabeth.martineau@us.af.mil
(marcus.green.7@us.af.mil, elizabeth.martineau@us.af.mil)
 
Description
The requirement is to provide a complete Design Build project to install a heat driven loop natural gas heater at the Hanscom AFB (HAFB) Gas Take Station.� The new heater shall be designed and installed in compliance with applicable Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications (UFGS) located at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc, American Gas Association Guidelines, and the Northeast Gas Association Guidelines, Manufacturers� recommended installation instructions, Air Force (AF) Codes, Regulations, Standards, Procedures, and all applicable Local, State, and Federal Codes & Regulations. The successful contractor will be required to acquire a new heat driven loop natural gas heater.� The proposed heater shall be capable of an output of up to 383,200 BTU / Hour.� Contractor shall verify heater output requirements during the design phase. The new natural gas heater should become the primary heat source and the existing heater the alternate heat source. The Contractor must be capable of providing the necessary controls and updates to the sequence of operations required to meet the intent of this project. The proposed heater should not require an enclosure and shall not produce noise levels above 60 decibels outside of the fenced gas take station equipment yard. Heater shall be 50% efficient with up to 70% thermal efficiency and shall be connected to emergency power. The following control points shall be included: gas pressure at inlet to boiler and steam temperature at outlet of boiler / inlet of heat exchanger.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f69831759e3f4195ad85ab5a10bef8f5/view)
 
Place of Performance
Address: Hanscom AFB, MA 01731, USA
Zip Code: 01731
Country: USA
 
Record
SN06754208-F 20230720/230718230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.