Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 27, 2023 SAM #7912
SOLICITATION NOTICE

Y -- CA ERFO 2021-02(1), North Fork Feather River Bridge

Notice Date
7/25/2023 2:46:32 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000012
 
Response Due
8/15/2023 1:00:00 PM
 
Archive Date
09/15/2023
 
Point of Contact
Eric Grosskreuz, Leslie Karsten
 
E-Mail Address
CFLConracts@dot.gov, CflContracts@dot.gov
(CFLConracts@dot.gov, CflContracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER:��CA ERFO 2021-2(1) PROJECT NAME:��North Fork Feather River Bridge The CA ERFO 2021-2(1) North Fork Feather River Bridge project is located in Plumas County, CA within the Plumas National Forest. The project site is approximately 16 miles northwest of Quincy, CA in mountainous terrain. The proposed road improvements include replacement of a damaged vehicular bridge and trail bridge. The replacement vehicular bridge is planned to be a steel girder structure with a span of 130 feet and a width of 18 feet. The bridge will be founded on drilled shafts. In addition, the scope includes replacement of a remote trail bridge. The trail bridge is planned to be a prefabricated steel structure with a span of 46 feet and a width of 6 feet. The trail bridge will be placed on�existing stone masonry abutments. Helicopter support will be required to deliver materials to the project site and to set the bridge. PRINCIPAL WORK ITEMS: Description� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �Unit� � � � � � �Est. Quantity Structural Concrete� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �CUYD� � � � � �100 Reinforcing Steel� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � LBS� � � � � � � 25,000 Structural Steel, Furnished, Fabricated, and Erected� � � � � � � � � � � � � � �LBS� � � � � � � 105,000 Drilled Shaft, 30 Inch Diameter� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �LNFT� � � � � � 300 Prefabricated Steel Bridge� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � LPSM� � � � � � ALL It is anticipated this project will be advertised in August� 2023 and be under construction in April 2024. The project has a completion date of October 4, 2024. The estimated price range of the project work is between $2,000,000 and $5,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a76b82d6c5494acab3be3303d748d831/view)
 
Place of Performance
Address: Quincy, CA 95971, USA
Zip Code: 95971
Country: USA
 
Record
SN06762469-F 20230727/230725230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.