Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 29, 2023 SAM #7914
SOLICITATION NOTICE

Y -- Chain Link Fence, Walk-in Gate and Crane Replacement Around Wister Outlet Channel

Notice Date
7/27/2023 11:56:34 AM
 
Notice Type
Solicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV23Q0085
 
Response Due
8/25/2023 1:00:00 PM
 
Archive Date
09/08/2023
 
Point of Contact
Clinton Yandell, Phone: 918-669-7559
 
E-Mail Address
clinton.j.yandell@usace.army.mil
(clinton.j.yandell@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
SCOPE OF WORK. The contractor shall provide all supplies, materials, labor, tools, and equipment necessary to install new chain-link fence and walk in gate around the Wister Lake Dam outlet channel. Remove existing steel frame and chain-link fencing. Remove all 68original fixed rail supports within the training wall. Clean and prep all fixed rail support drilled holes to be filled in with grout and water-proof coating. Add a 6-inch x 6-inch x 1/4-inch floor flange to the sidewalk running around the outside of the training wall (Photo # 8 ? 9).Recommend using HILTI HIT-HY 200-R V3 ADHESIVE ANCHOR and HIT-Z ANCHORROD (zinc-coated). Using this option would eliminate additional drilling into the training wall. The length of fence to be installed in total is 463 ft. Approximately 315 ft. of fencing will be 6ftin Hight. Approximately 148 ft of fencing will be 4 ft tall. The Walk-in gate will need to be 5 ft. Wide X 6 ft in height. The Chain-link will need to be knuckled at the top. Tubing needs to be schedule 40 wall thickness for all frameworks. Line posts need to be 2 3/8? diameter. Terminals/Gate Posts/Corner Posts: 2 7/8? Diameter. Top Rail: 1 5/8? Diameter. Chain Link Fence: 9 Gage Wire and 2? Diamond Size. The contractor will also need to remove the existing winch/crane and build new. This winch/crane needs to have electric controls and able to support up to 5K pounds. The winch will need to be removable. This allows us to store winch when not being used. This work will require working around hazardous fall conditions so proper safety precautions must always be maintained. This work will take place at the Wister Lake Dam, located in Wister Oklahoma. Address 25334 US-270, Wister, OK74966
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6ab787dd3f3348ce94405b552c8aae17/view)
 
Record
SN06766374-F 20230729/230727230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.