SOLICITATION NOTICE
Y -- Level I Confinement Facility Addition - Hill Air Force Base (HAFB), Utah
- Notice Date
- 7/28/2023 8:56:13 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
- ZIP Code
- 95814-2922
- Solicitation Number
- W9123823R0047
- Response Due
- 8/10/2023 1:00:00 PM
- Archive Date
- 07/27/2024
- Point of Contact
- Matthew Webb, Phone: 9165577109, Amelia Bryant, Phone: 9165577685
- E-Mail Address
-
matthew.m.webb@usace.army.mil, Amelia.K.Bryant@usace.army.mil
(matthew.m.webb@usace.army.mil, Amelia.K.Bryant@usace.army.mil)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Awardee
- null
- Description
- ** Amendment 0003 to solicitation W9123823R0047 extends the proposal due date and adds additional attachments; Uploads Amendment 0002 Attachment 16 (Site Visit Roster) to PIEE ** Amendment 0002 to solicitation W9123823R0047 provides 1) an update to Section VIII (Evaluation Approach) of solicitation section 00 22 00 - Supplementary Instructions, and 2) adds Attachment 16 - Site Visit Roster ** Amendment 0001 to solicitation W9123823R0047 provides updated site visit information under FAR provision 52.236-27 (Alternate I) ** The contractor shall provide a single story, Level I Regional Confinement Facility addition to Building 408, Security Forces Operations Center to accommodate a four-cell requirement in accordance with Air Force Instruction 31-205 Air Force Corrections System. The masonry cavity wall construction with a flat metal roof will include administrative areas, visitation/training room, waiting area, a day room, and outdoor recreation area. The project also will include fire suppression system, all utilities, communications, site improvements, and associated support facilities. The facility will be compatible with applicable Department of Defense, Air Force, and base design standards. In addition, local materials and construction techniques shall be used were cost effective. The facility will be designed as permanent construction in accordance with Unified Facilities Criteria 1-200-01, General Building Requirements. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Unified Facilities Criteria 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/6601d50b62df4d1eb424c8173d6611cb/view)
- Record
- SN06768236-F 20230730/230728230048 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |